The production scheduling using economic lot sizing approach at a pharmaceutical company.
This thesis is the result of a three month internship at TCG Pharmaceuticals, Singapore. With the increasing demand of the products, the increased capital costs for putting capacity, it becomes very important for TCG to have an optimum scheduling With the worldwide initiative of lean manufacturing i...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/13615 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Be the first to leave a comment!