Temporal development of propeller scour around a sloping bank
This study presents results of the temporal development of propeller scour around a sloping bank. During the scouring process, the centerline scour profile along the propeller axis comprises a toe scour hole, a primary scour hole, or a combination of both. Their formation is dependent on the length...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/139117 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-139117 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-1391172020-05-15T08:34:47Z Temporal development of propeller scour around a sloping bank Wei, Maoxing Chiew, Yee-Meng Guan, Dawei School of Civil and Environmental Engineering Engineering::Environmental engineering Propeller Scour Sediment Transport This study presents results of the temporal development of propeller scour around a sloping bank. During the scouring process, the centerline scour profile along the propeller axis comprises a toe scour hole, a primary scour hole, or a combination of both. Their formation is dependent on the length of the toe clearances, which is defined as the longitudinal distance between the propeller face and toe of the slope. As a result, the overall maximum scour depth along the centerline profile may occur either in the primary or toe scour hole. The results show that the temporal development of the overall maximum scour depth for all the cases consistently exhibits an exponential form. An empirical method was obtained to estimate the maximum scour depth evolution throughout the scouring process. 2020-05-15T08:34:47Z 2020-05-15T08:34:47Z 2018 Journal Article Wei, M., Chiew, Y.-M., & Guan, D. (2018). Temporal development of propeller scour around a sloping bank. Journal of Waterway, Port, Coastal, and Ocean Engineering, 144(5), 06018005-. doi:10.1061/(ASCE)WW.1943-5460.0000465 0733-950X https://hdl.handle.net/10356/139117 10.1061/(ASCE)WW.1943-5460.0000465 2-s2.0-85064071221 5 144 en Journal of Waterway, Port, Coastal and Ocean Engineering © 2018 American Society of Civil Engineers. All rights reserved. |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
language |
English |
topic |
Engineering::Environmental engineering Propeller Scour Sediment Transport |
spellingShingle |
Engineering::Environmental engineering Propeller Scour Sediment Transport Wei, Maoxing Chiew, Yee-Meng Guan, Dawei Temporal development of propeller scour around a sloping bank |
description |
This study presents results of the temporal development of propeller scour around a sloping bank. During the scouring process, the centerline scour profile along the propeller axis comprises a toe scour hole, a primary scour hole, or a combination of both. Their formation is dependent on the length of the toe clearances, which is defined as the longitudinal distance between the propeller face and toe of the slope. As a result, the overall maximum scour depth along the centerline profile may occur either in the primary or toe scour hole. The results show that the temporal development of the overall maximum scour depth for all the cases consistently exhibits an exponential form. An empirical method was obtained to estimate the maximum scour depth evolution throughout the scouring process. |
author2 |
School of Civil and Environmental Engineering |
author_facet |
School of Civil and Environmental Engineering Wei, Maoxing Chiew, Yee-Meng Guan, Dawei |
format |
Article |
author |
Wei, Maoxing Chiew, Yee-Meng Guan, Dawei |
author_sort |
Wei, Maoxing |
title |
Temporal development of propeller scour around a sloping bank |
title_short |
Temporal development of propeller scour around a sloping bank |
title_full |
Temporal development of propeller scour around a sloping bank |
title_fullStr |
Temporal development of propeller scour around a sloping bank |
title_full_unstemmed |
Temporal development of propeller scour around a sloping bank |
title_sort |
temporal development of propeller scour around a sloping bank |
publishDate |
2020 |
url |
https://hdl.handle.net/10356/139117 |
_version_ |
1681057029956829184 |