Analysis of grouting design based on water control for rock tunnels
Water inflow into rock tunnels is an adverse but unavoidable problem in projects under ground water table. In fractured rock masses, discontinuities are pathways for water inflow when they are conductive. When water inflow takes place, fillings in persistent discontinuities will be flew out, whic...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis-Doctor of Philosophy |
Language: | English |
Published: |
Nanyang Technological University
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/139940 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | Water inflow into rock tunnels is an adverse but unavoidable problem in projects under
ground water table. In fractured rock masses, discontinuities are pathways for water
inflow when they are conductive. When water inflow takes place, fillings in persistent
discontinuities will be flew out, which may reduce the strength of the fractured rock mass
and may even lead to tunnel instability and unsafe working conditions. Moreover, the
excavation speed is probably reduced due to water inflow which may result in an increase
in construction time and cost.
Rock grouting is a conventional and commonly used water control strategy. Grouting
efficiency and cost-effectiveness are two key aspects in grouting engineering. The
prediction of the water inflow into rock tunnels, the investigation of the influence from
grouting on water inflow and the estimation of grout take are of interest for grouting
engineers. However, theoretical analyses developed so far have limited use in grouting
design due to the complexity of site geological and hydro-geological conditions, and the
commonly used empirical based grouting designs heavily depend on engineers’ personal
experiences. Therefore, the present work tries to fill several gaps in theoretical analysis
and practical grouting design based on onsite data analysis.
Firstly, the relationships between the various water inflow parameters, including the
water inflows into probe holes, tunnels, check holes and grouted tunnels, are obtained for
the preliminary design of water control strategy. In addition, an analytical solution for
water inflow into a grouted tunnel considering exponential decay of hydraulic
conductivity with depth is proposed. This analytical solution reveals that when the decay
gradient of hydraulic conductivity is relatively large, its influence should be considered
in grouting design.
To assist a cost-effective grouting design for water control, the distributions of
hydrogeological properties in a real project are investigated. It is found that both the water
inflow in grout holes and hydraulic conductivity at the drilling location of grout holes
follow a logarithmic relationship. Besides, the influence from grouting overlaps should be taken into consideration in the calculation of field hydraulic conductivity. To assist
data analysis, an App for practical grouting visualization, analysis, and prediction is
proposed.
Finally, the Artificial Neural Network (ANN) is used for developing predictive models
for grout take forecasting to assist a cost-effective grouting design. The present study
shows that it is difficult to derive a predictive model with a high degree of reliability for
estimating grout take at individual grout hole. However, the reliability of the predictive
models will increase after data are categorized properly. Besides, the grout take at
individual station can be well predicted via geological and hydrogeological data classified
by individual stations. It is hopefully that with more project data added into the project
database, the accuracy of these predictive models can be further improved. |
---|