Implementation of construction informatics to improve the pre and postproduction of precast supply chain

Precast concretes are cast and cured offsite in a controlled environment before they are brought to site to be installed. This process allows them to have advantages over cast-in-situ concretes, such as better quality, shorter construction time, etc. One of main factors that would affect the efficie...

Full description

Saved in:
Bibliographic Details
Main Author: Sim, Aaron Jie Hao
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project
Language:English
Published: Nanyang Technological University 2020
Subjects:
Online Access:https://hdl.handle.net/10356/140991
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-140991
record_format dspace
spelling sg-ntu-dr.10356-1409912020-06-03T06:05:42Z Implementation of construction informatics to improve the pre and postproduction of precast supply chain Sim, Aaron Jie Hao Tiong Lee Kong, Robert School of Civil and Environmental Engineering CLKTIONG@ntu.edu.sg Engineering::Civil engineering::Construction management Precast concretes are cast and cured offsite in a controlled environment before they are brought to site to be installed. This process allows them to have advantages over cast-in-situ concretes, such as better quality, shorter construction time, etc. One of main factors that would affect the efficiency of the precast process greatly is its supply chain. In this paper, value stream mapping, a production method, will be used on a precast manufacturer’s supply chain to identify the possible areas of improvements (current state map) Improvements were made through the application of RFID technology, BIM and network platforms to achieve an enhanced supply chain (future state map). The two stream maps are compared to analyze how the changes in system effect the productivity and efficiency of the supply chain. Bachelor of Engineering (Civil) 2020-06-03T06:05:42Z 2020-06-03T06:05:42Z 2020 Final Year Project (FYP) https://hdl.handle.net/10356/140991 en application/pdf Nanyang Technological University
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
language English
topic Engineering::Civil engineering::Construction management
spellingShingle Engineering::Civil engineering::Construction management
Sim, Aaron Jie Hao
Implementation of construction informatics to improve the pre and postproduction of precast supply chain
description Precast concretes are cast and cured offsite in a controlled environment before they are brought to site to be installed. This process allows them to have advantages over cast-in-situ concretes, such as better quality, shorter construction time, etc. One of main factors that would affect the efficiency of the precast process greatly is its supply chain. In this paper, value stream mapping, a production method, will be used on a precast manufacturer’s supply chain to identify the possible areas of improvements (current state map) Improvements were made through the application of RFID technology, BIM and network platforms to achieve an enhanced supply chain (future state map). The two stream maps are compared to analyze how the changes in system effect the productivity and efficiency of the supply chain.
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Sim, Aaron Jie Hao
format Final Year Project
author Sim, Aaron Jie Hao
author_sort Sim, Aaron Jie Hao
title Implementation of construction informatics to improve the pre and postproduction of precast supply chain
title_short Implementation of construction informatics to improve the pre and postproduction of precast supply chain
title_full Implementation of construction informatics to improve the pre and postproduction of precast supply chain
title_fullStr Implementation of construction informatics to improve the pre and postproduction of precast supply chain
title_full_unstemmed Implementation of construction informatics to improve the pre and postproduction of precast supply chain
title_sort implementation of construction informatics to improve the pre and postproduction of precast supply chain
publisher Nanyang Technological University
publishDate 2020
url https://hdl.handle.net/10356/140991
_version_ 1681056578778693632