Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints

Prefabricated Prefinished Volumetric Construction (PPVC) is a kind of emerging energy-saving and environmentally friendly construction method that has gained in-creasing popularity in recent years. With the ability of widely applied substantial economic benefits, it consequently promoted by Singapor...

Full description

Saved in:
Bibliographic Details
Main Author: Tang, Xiuke
Other Authors: Wu Kan
Format: Thesis-Master by Coursework
Language:English
Published: Nanyang Technological University 2020
Subjects:
Online Access:https://hdl.handle.net/10356/142895
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-142895
record_format dspace
spelling sg-ntu-dr.10356-1428952023-03-11T17:32:28Z Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints Tang, Xiuke Wu Kan School of Mechanical and Aerospace Engineering WuKan@ntu.edu.sg Engineering::Systems engineering Prefabricated Prefinished Volumetric Construction (PPVC) is a kind of emerging energy-saving and environmentally friendly construction method that has gained in-creasing popularity in recent years. With the ability of widely applied substantial economic benefits, it consequently promoted by Singapore national policies. Since the manufacturing technologies of PPVC are approaching maturity, the increasing automation and standardization of the production flow are introduced to PPVC factories, able to adopt the concept of manufacturing. Notably, the uncertainty in the working schedule could be reduced significantly in the production process. Currently, the construction industry relies heavily on manual operation. Even if PPVC involves more automation robotics, the management of the shop floor is inef-ficiently controlled by manual work. Thus, it is urgent to improve via modern infor-mation technologies, especially in scheduling. For the manufacturing procedures, some are operated in the fixed sequence, and others are non-fixed sequence. For fixed sequence processes, the scheduling can be regarded as the flow shop schedul-ing problem (FSSP), and non-fixed sequence processes are regarded as open shop scheduling problem (OSSP). Therefore, this dissertation proposes a mathematical model that combines the OSSP and FSSP scheduling problems and simulates the actual situation in PPVC factory. This dissertation utilized genetic algorithms (GA), particle swarm optimization algorithms (PSO) and proposed a PSO based on GA algorithm to solve shop floor scheduling problems in PPVC factories. The reliability of the model and algorithm is validated through applications and comparisons with manual scheduling. Furthermore, the scheduling model in this dissertation can work as the foundation for the establishment of smart factories and MES systems in the future and provide a valid reference. Master of Science (Supply Chain and Logistics) 2020-07-07T06:28:57Z 2020-07-07T06:28:57Z 2020 Thesis-Master by Coursework https://hdl.handle.net/10356/142895 en application/pdf Nanyang Technological University
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic Engineering::Systems engineering
spellingShingle Engineering::Systems engineering
Tang, Xiuke
Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
description Prefabricated Prefinished Volumetric Construction (PPVC) is a kind of emerging energy-saving and environmentally friendly construction method that has gained in-creasing popularity in recent years. With the ability of widely applied substantial economic benefits, it consequently promoted by Singapore national policies. Since the manufacturing technologies of PPVC are approaching maturity, the increasing automation and standardization of the production flow are introduced to PPVC factories, able to adopt the concept of manufacturing. Notably, the uncertainty in the working schedule could be reduced significantly in the production process. Currently, the construction industry relies heavily on manual operation. Even if PPVC involves more automation robotics, the management of the shop floor is inef-ficiently controlled by manual work. Thus, it is urgent to improve via modern infor-mation technologies, especially in scheduling. For the manufacturing procedures, some are operated in the fixed sequence, and others are non-fixed sequence. For fixed sequence processes, the scheduling can be regarded as the flow shop schedul-ing problem (FSSP), and non-fixed sequence processes are regarded as open shop scheduling problem (OSSP). Therefore, this dissertation proposes a mathematical model that combines the OSSP and FSSP scheduling problems and simulates the actual situation in PPVC factory. This dissertation utilized genetic algorithms (GA), particle swarm optimization algorithms (PSO) and proposed a PSO based on GA algorithm to solve shop floor scheduling problems in PPVC factories. The reliability of the model and algorithm is validated through applications and comparisons with manual scheduling. Furthermore, the scheduling model in this dissertation can work as the foundation for the establishment of smart factories and MES systems in the future and provide a valid reference.
author2 Wu Kan
author_facet Wu Kan
Tang, Xiuke
format Thesis-Master by Coursework
author Tang, Xiuke
author_sort Tang, Xiuke
title Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
title_short Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
title_full Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
title_fullStr Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
title_full_unstemmed Scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
title_sort scheduling for prefabricated prefinished volumetric construction with resource eligibility constraints
publisher Nanyang Technological University
publishDate 2020
url https://hdl.handle.net/10356/142895
_version_ 1761781522937937920