Adaptable Container Terminal Simulator (ACTS)

This tri-party collaboration aims to showcase the capability of the ACTS tool, through a real-life example. The ACTS (Adaptable Container Terminal Simulator) tool developed by NTU and MPA was used to construct ACTS-JPPL, a customized container terminal simulation model for JPPL. A simulation study w...

Full description

Saved in:
Bibliographic Details
Main Author: Toh, Ah Cheong.
Other Authors: School of Computer Engineering
Format: Research Report
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/14728
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-14728
record_format dspace
spelling sg-ntu-dr.10356-147282023-03-03T20:22:12Z Adaptable Container Terminal Simulator (ACTS) Toh, Ah Cheong. School of Computer Engineering Maritime Research Centre DRNTU::Engineering::Computer science and engineering::Computer applications::Computers in other systems This tri-party collaboration aims to showcase the capability of the ACTS tool, through a real-life example. The ACTS (Adaptable Container Terminal Simulator) tool developed by NTU and MPA was used to construct ACTS-JPPL, a customized container terminal simulation model for JPPL. A simulation study was thereafter undertaken with the objective of estimating the JPPL container terminal capacity. ACTS-JPPL models JPPL's terminal layout and resources, and implements its operating policies as used in the day-to-day planning. The model was validated and confirmed to be reliable by JPPL. The constructed ACTS-JPPL model was then used to conduct the capacity estimation study. The basic requirement of the study was to estimate the terminal capacity with the current resource settings. The terminal is said to reach its capacity when the storage yard runs out of space, or the service level downgrades to an unacceptable level, with the increase in vessel traffic. The results indicated the JPPL container terminal capacity to be 1.0M TEU per year with 26 storage blocks, or 1.4M TEU per year with 32 storage blocks. The main constraining factor to the capacity was found to be the yard space available for storage. The quayside facilities and resources currently available at JPPL were found to have a higher sustainable capacity as compared to the yard. Service levels at these capacity thresholds were still within the acceptable range. 2009-01-21T03:40:46Z 2009-01-21T03:40:46Z 2007 2007 Research Report http://hdl.handle.net/10356/14728 en 231 p. application/pdf application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Computer science and engineering::Computer applications::Computers in other systems
spellingShingle DRNTU::Engineering::Computer science and engineering::Computer applications::Computers in other systems
Toh, Ah Cheong.
Adaptable Container Terminal Simulator (ACTS)
description This tri-party collaboration aims to showcase the capability of the ACTS tool, through a real-life example. The ACTS (Adaptable Container Terminal Simulator) tool developed by NTU and MPA was used to construct ACTS-JPPL, a customized container terminal simulation model for JPPL. A simulation study was thereafter undertaken with the objective of estimating the JPPL container terminal capacity. ACTS-JPPL models JPPL's terminal layout and resources, and implements its operating policies as used in the day-to-day planning. The model was validated and confirmed to be reliable by JPPL. The constructed ACTS-JPPL model was then used to conduct the capacity estimation study. The basic requirement of the study was to estimate the terminal capacity with the current resource settings. The terminal is said to reach its capacity when the storage yard runs out of space, or the service level downgrades to an unacceptable level, with the increase in vessel traffic. The results indicated the JPPL container terminal capacity to be 1.0M TEU per year with 26 storage blocks, or 1.4M TEU per year with 32 storage blocks. The main constraining factor to the capacity was found to be the yard space available for storage. The quayside facilities and resources currently available at JPPL were found to have a higher sustainable capacity as compared to the yard. Service levels at these capacity thresholds were still within the acceptable range.
author2 School of Computer Engineering
author_facet School of Computer Engineering
Toh, Ah Cheong.
format Research Report
author Toh, Ah Cheong.
author_sort Toh, Ah Cheong.
title Adaptable Container Terminal Simulator (ACTS)
title_short Adaptable Container Terminal Simulator (ACTS)
title_full Adaptable Container Terminal Simulator (ACTS)
title_fullStr Adaptable Container Terminal Simulator (ACTS)
title_full_unstemmed Adaptable Container Terminal Simulator (ACTS)
title_sort adaptable container terminal simulator (acts)
publishDate 2009
url http://hdl.handle.net/10356/14728
_version_ 1759856577017282560