BIM data processing for project management

With the rapid development of the construction industry and computational technology, the digital delivery (IDD) in construction has been developed and started to be adopted by big players. However, for smaller players, such adoption is still far fetch due to lack of expertise in utilising the IDD t...

Full description

Saved in:
Bibliographic Details
Main Author: Lee, Wai Chi
Other Authors: Teoh Bak Koon
Format: Final Year Project
Language:English
Published: Nanyang Technological University 2022
Subjects:
Online Access:https://hdl.handle.net/10356/154586
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-154586
record_format dspace
spelling sg-ntu-dr.10356-1545862022-01-03T06:36:58Z BIM data processing for project management Lee, Wai Chi Teoh Bak Koon School of Civil and Environmental Engineering bakkoon.teoh@ntu.edu.sg Engineering::Civil engineering With the rapid development of the construction industry and computational technology, the digital delivery (IDD) in construction has been developed and started to be adopted by big players. However, for smaller players, such adoption is still far fetch due to lack of expertise in utilising the IDD tools. This project tried to look into one of the important IDD tool – 4D BIM, or project schedule management, to investigate the challenges from domain user perspectives and to see if there are critical bottle neck that needs to be tackled. In the process of building design, construction programme and operation, multiple software are needed, and it is difficult to share, exchange and store data between different software for multiple parties and multiple professions, resulting in a disconnection of data flow between different stages and project personnel. Such data exchange required both domain knowledges as well as software customisation capabilities. This leads to the 4D BIM is not widely used especially for small players that do not have much inhouse capabilities. Upon closer scrutiny, it is observed that key technical challenge in utilising 4D BIM is transferring critical data from 3D model components to planning application and linking these data with the timeline information. If this can be done, current 4D software can then be utilised to perform simulation as well as visualising the construction sequence. At the same time, since data are linked with timeline, cost data can also be added and 5D applications can be easily deployed. This study explores ways to make use of Application Programming Interface (API) and visual programming tools, to facilitate critical data transfer and linking process, albeit semi-automatically, so that 4D and 5D BIM can be utilised by domain users, without much programming knowledge requirements. Bachelor of Engineering (Civil) 2022-01-03T06:36:58Z 2022-01-03T06:36:58Z 2021 Final Year Project (FYP) Lee, W. C. (2021). BIM data processing for project management. Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/154586 https://hdl.handle.net/10356/154586 en CM12 application/pdf Nanyang Technological University
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic Engineering::Civil engineering
spellingShingle Engineering::Civil engineering
Lee, Wai Chi
BIM data processing for project management
description With the rapid development of the construction industry and computational technology, the digital delivery (IDD) in construction has been developed and started to be adopted by big players. However, for smaller players, such adoption is still far fetch due to lack of expertise in utilising the IDD tools. This project tried to look into one of the important IDD tool – 4D BIM, or project schedule management, to investigate the challenges from domain user perspectives and to see if there are critical bottle neck that needs to be tackled. In the process of building design, construction programme and operation, multiple software are needed, and it is difficult to share, exchange and store data between different software for multiple parties and multiple professions, resulting in a disconnection of data flow between different stages and project personnel. Such data exchange required both domain knowledges as well as software customisation capabilities. This leads to the 4D BIM is not widely used especially for small players that do not have much inhouse capabilities. Upon closer scrutiny, it is observed that key technical challenge in utilising 4D BIM is transferring critical data from 3D model components to planning application and linking these data with the timeline information. If this can be done, current 4D software can then be utilised to perform simulation as well as visualising the construction sequence. At the same time, since data are linked with timeline, cost data can also be added and 5D applications can be easily deployed. This study explores ways to make use of Application Programming Interface (API) and visual programming tools, to facilitate critical data transfer and linking process, albeit semi-automatically, so that 4D and 5D BIM can be utilised by domain users, without much programming knowledge requirements.
author2 Teoh Bak Koon
author_facet Teoh Bak Koon
Lee, Wai Chi
format Final Year Project
author Lee, Wai Chi
author_sort Lee, Wai Chi
title BIM data processing for project management
title_short BIM data processing for project management
title_full BIM data processing for project management
title_fullStr BIM data processing for project management
title_full_unstemmed BIM data processing for project management
title_sort bim data processing for project management
publisher Nanyang Technological University
publishDate 2022
url https://hdl.handle.net/10356/154586
_version_ 1722355282852446208