The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)

The Ballast Water Management (BWM) Convention has been ratified for four years since September 2014. The final deadline for compliance with the D-2 Standard is fast approaching in a short two years. However, there is still high uncertainty in the maritime industry of the validity of the D-2 Standard...

Full description

Saved in:
Bibliographic Details
Main Author: Chew, Zi Xin
Other Authors: Lum Kit Meng
Format: Final Year Project
Language:English
Published: Nanyang Technological University 2022
Subjects:
Online Access:https://hdl.handle.net/10356/157548
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-157548
record_format dspace
spelling sg-ntu-dr.10356-1575482022-05-19T12:55:57Z The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact) Chew, Zi Xin Lum Kit Meng School of Civil and Environmental Engineering CKMLUM@ntu.edu.sg Engineering::Maritime studies The Ballast Water Management (BWM) Convention has been ratified for four years since September 2014. The final deadline for compliance with the D-2 Standard is fast approaching in a short two years. However, there is still high uncertainty in the maritime industry of the validity of the D-2 Standard and its efficacy surrounding many factors. This study investigates the impacts of D-2 Standard on key stakeholders from a technical, environmental, and social (well-being) perspective to evaluate whether the D-2 Standard is worth pursuing despite its limitations. Data is collected from the maritime industry through surveys and interviews conducted as well as previous literature done on the subject. The analysis of data collected shows a consensus that the D-2 Standard contributes positively to the environment. However, the main problems found were the lack of standardization in legislation (IMO vs USCG) and regulations (Guidelines of BWM Convention), the discharge of disinfection by products (DBPs) and the overwhelming variety of Ballast Water Treatment Systems (BWTS) available in the market. These problems pose challenges to streamlining of the BWM Convention, clean ballast water discharge and training of seafarers. Recommendations for shore-based treatment system and standardization of BWTS were given to mitigate the negative impacts of the D-2 Standard. Bachelor of Science (Maritime Studies) 2022-05-19T12:55:57Z 2022-05-19T12:55:57Z 2022 Final Year Project (FYP) Chew, Z. X. (2022). The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact). Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/157548 https://hdl.handle.net/10356/157548 en MS-12 application/pdf Nanyang Technological University
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic Engineering::Maritime studies
spellingShingle Engineering::Maritime studies
Chew, Zi Xin
The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
description The Ballast Water Management (BWM) Convention has been ratified for four years since September 2014. The final deadline for compliance with the D-2 Standard is fast approaching in a short two years. However, there is still high uncertainty in the maritime industry of the validity of the D-2 Standard and its efficacy surrounding many factors. This study investigates the impacts of D-2 Standard on key stakeholders from a technical, environmental, and social (well-being) perspective to evaluate whether the D-2 Standard is worth pursuing despite its limitations. Data is collected from the maritime industry through surveys and interviews conducted as well as previous literature done on the subject. The analysis of data collected shows a consensus that the D-2 Standard contributes positively to the environment. However, the main problems found were the lack of standardization in legislation (IMO vs USCG) and regulations (Guidelines of BWM Convention), the discharge of disinfection by products (DBPs) and the overwhelming variety of Ballast Water Treatment Systems (BWTS) available in the market. These problems pose challenges to streamlining of the BWM Convention, clean ballast water discharge and training of seafarers. Recommendations for shore-based treatment system and standardization of BWTS were given to mitigate the negative impacts of the D-2 Standard.
author2 Lum Kit Meng
author_facet Lum Kit Meng
Chew, Zi Xin
format Final Year Project
author Chew, Zi Xin
author_sort Chew, Zi Xin
title The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
title_short The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
title_full The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
title_fullStr The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
title_full_unstemmed The impacts of D-2 ballast water management standard on stakeholders (social-well-being impact)
title_sort impacts of d-2 ballast water management standard on stakeholders (social-well-being impact)
publisher Nanyang Technological University
publishDate 2022
url https://hdl.handle.net/10356/157548
_version_ 1734310182524026880