Real-time water quality measurements and predictions for the Marina Catchment

The objectives of the project are to establish a relationship between real-time and lab-measured data and using this correlation to predict real time water quality in the Marina Catchment. The YSI was used in monitoring real-time water quality while the auto-sampler triggered during a heavy storm co...

全面介紹

Saved in:
書目詳細資料
主要作者: Lee, Maureen Seok Mui.
其他作者: Chua Hock Chye Lloyd
格式: Final Year Project
語言:English
出版: 2009
主題:
在線閱讀:http://hdl.handle.net/10356/15839
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English
id sg-ntu-dr.10356-15839
record_format dspace
spelling sg-ntu-dr.10356-158392023-03-03T17:07:46Z Real-time water quality measurements and predictions for the Marina Catchment Lee, Maureen Seok Mui. Chua Hock Chye Lloyd School of Civil and Environmental Engineering DRNTU::Engineering The objectives of the project are to establish a relationship between real-time and lab-measured data and using this correlation to predict real time water quality in the Marina Catchment. The YSI was used in monitoring real-time water quality while the auto-sampler triggered during a heavy storm collects water samples to be tested in the laboratory. A high correlation value between YSI-measured turbidity and lab-measured TSS was found and thus prediction of TSS concentration was done, given the turbidity value. Loading of the river was thus estimated. Some of the problems faced during the project were the lack of rainfall and instrument errors, resulting in limited data collected. Despite the limitations and problems faced, the correlation found could be used in future predictions. Continuous sampling could be done to validate the accuracy of the relationship. Bachelor of Engineering (Environmental Engineering) 2009-05-18T01:25:04Z 2009-05-18T01:25:04Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/15839 en Nanyang Technological University 90 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Lee, Maureen Seok Mui.
Real-time water quality measurements and predictions for the Marina Catchment
description The objectives of the project are to establish a relationship between real-time and lab-measured data and using this correlation to predict real time water quality in the Marina Catchment. The YSI was used in monitoring real-time water quality while the auto-sampler triggered during a heavy storm collects water samples to be tested in the laboratory. A high correlation value between YSI-measured turbidity and lab-measured TSS was found and thus prediction of TSS concentration was done, given the turbidity value. Loading of the river was thus estimated. Some of the problems faced during the project were the lack of rainfall and instrument errors, resulting in limited data collected. Despite the limitations and problems faced, the correlation found could be used in future predictions. Continuous sampling could be done to validate the accuracy of the relationship.
author2 Chua Hock Chye Lloyd
author_facet Chua Hock Chye Lloyd
Lee, Maureen Seok Mui.
format Final Year Project
author Lee, Maureen Seok Mui.
author_sort Lee, Maureen Seok Mui.
title Real-time water quality measurements and predictions for the Marina Catchment
title_short Real-time water quality measurements and predictions for the Marina Catchment
title_full Real-time water quality measurements and predictions for the Marina Catchment
title_fullStr Real-time water quality measurements and predictions for the Marina Catchment
title_full_unstemmed Real-time water quality measurements and predictions for the Marina Catchment
title_sort real-time water quality measurements and predictions for the marina catchment
publishDate 2009
url http://hdl.handle.net/10356/15839
_version_ 1759857356960694272