Capacities of cross-junction and roundabout in Nanyang Technological University
There are many types of intersections which can be found on the roads. They can be classified according to their number of legs, shape and whether signalized or un-signalized. An unsignalized four-way cross junction is the type which this study is focusing. It is divided into major road and mino...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/16051 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-16051 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-160512023-03-03T16:52:34Z Capacities of cross-junction and roundabout in Nanyang Technological University Tan, Soon Hin. Fan Shing Leung, Henry School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Transportation There are many types of intersections which can be found on the roads. They can be classified according to their number of legs, shape and whether signalized or un-signalized. An unsignalized four-way cross junction is the type which this study is focusing. It is divided into major road and minor road. Major road has the priority to move and do not need to give way to minor road traffic. Stop signs are displayed at the minor road to warn drivers they have to stop. When the total traffic volume is equally spread among the legs, it is advisable to select roundabout as the choice to diversify the traffic. This will decrease the concentrated delay time on a particular leg. The uneven traffic flows at the cross junction proved that why cross-junction is better than roundabout in terms of capacity. Based on the data, it showed a lower volume of traffic making right-turn within the cross junction. If there is an uneven traffic volume occurs within roundabout, most likely it will consider as the roundabout is not fulfilling the condition. Bachelor of Engineering (Civil) 2009-05-20T06:27:11Z 2009-05-20T06:27:11Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/16051 en Nanyang Technological University 37 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Transportation |
spellingShingle |
DRNTU::Engineering::Civil engineering::Transportation Tan, Soon Hin. Capacities of cross-junction and roundabout in Nanyang Technological University |
description |
There are many types of intersections which can be found on the roads. They can be classified according to their number of legs, shape and whether signalized or un-signalized.
An unsignalized four-way cross junction is the type which this study is focusing. It is divided into major road and minor road. Major road has the priority to move and do not need to give way to minor road traffic. Stop signs are displayed at the minor road to warn drivers they have to stop.
When the total traffic volume is equally spread among the legs, it is advisable to select roundabout as the choice to diversify the traffic. This will decrease the concentrated delay time on a particular leg.
The uneven traffic flows at the cross junction proved that why cross-junction is better than roundabout in terms of capacity. Based on the data, it showed a lower volume of traffic making right-turn within the cross junction. If there is an uneven traffic volume occurs within roundabout, most likely it will consider as the roundabout is not fulfilling the condition. |
author2 |
Fan Shing Leung, Henry |
author_facet |
Fan Shing Leung, Henry Tan, Soon Hin. |
format |
Final Year Project |
author |
Tan, Soon Hin. |
author_sort |
Tan, Soon Hin. |
title |
Capacities of cross-junction and roundabout in Nanyang Technological University |
title_short |
Capacities of cross-junction and roundabout in Nanyang Technological University |
title_full |
Capacities of cross-junction and roundabout in Nanyang Technological University |
title_fullStr |
Capacities of cross-junction and roundabout in Nanyang Technological University |
title_full_unstemmed |
Capacities of cross-junction and roundabout in Nanyang Technological University |
title_sort |
capacities of cross-junction and roundabout in nanyang technological university |
publishDate |
2009 |
url |
http://hdl.handle.net/10356/16051 |
_version_ |
1759853824987627520 |