Modelling of roster : optimization of DEM roster at SGH

A rise in standard of living in Singapore has led to an increase of healthcare awareness among people. This trend is in fact keeping healthcare centers busier than before. Therefore, there is a need to maintain high efficiency in healthcare centre at the same time ensuring that the staffs are still...

Full description

Saved in:
Bibliographic Details
Main Author: Yap, Wei Qing.
Other Authors: Rajesh Piplani
Format: Final Year Project
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/16201
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-16201
record_format dspace
spelling sg-ntu-dr.10356-162012023-03-04T18:31:09Z Modelling of roster : optimization of DEM roster at SGH Yap, Wei Qing. Rajesh Piplani School of Mechanical and Aerospace Engineering Singapore General Hospital DRNTU::Engineering::Industrial engineering::Managerial control systems A rise in standard of living in Singapore has led to an increase of healthcare awareness among people. This trend is in fact keeping healthcare centers busier than before. Therefore, there is a need to maintain high efficiency in healthcare centre at the same time ensuring that the staffs are still leading a balance and healthy working lifestyle. In this project, the author got the chance to work together with Singhealth and Department of Emergency (DEM) in Singapore General Hospital (SGH). Singhealth had studied that the current DEM (Department of Emergency) roster needs to be improved in terms of ease of planning and efficiency. Operation research technique was employed to carry out this project. Firstly, the process flow of the DEM roster was mapped out. The problem was later looked upon as an assignment problem and linear programming method was used to tackle the problem. The objectives of the problem were first identified. Later on, the constraints and conditions attached to the problem were analyzed as well. Finally, they were being converted to mathematical equations. These equations were input into spreadsheets which formed the model. Basic solver was used at the beginning stage to test out the roster’s feasibility. Later on, risk solver which is a more advanced software was used to complete the model. The solutions were reviewed at the end after the model had been solved. They met most of the constraints and requirements that DEM wants. However, the author feels that the model can work better on a larger scale advanced solver where unlimited decision variables can be used. An improved version of the new model using advanced solver could be much more desirable than the current DEM roster that the doctors are using. Bachelor of Engineering (Mechanical Engineering) 2009-05-22T06:25:47Z 2009-05-22T06:25:47Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/16201 en Nanyang Technological University 125 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Industrial engineering::Managerial control systems
spellingShingle DRNTU::Engineering::Industrial engineering::Managerial control systems
Yap, Wei Qing.
Modelling of roster : optimization of DEM roster at SGH
description A rise in standard of living in Singapore has led to an increase of healthcare awareness among people. This trend is in fact keeping healthcare centers busier than before. Therefore, there is a need to maintain high efficiency in healthcare centre at the same time ensuring that the staffs are still leading a balance and healthy working lifestyle. In this project, the author got the chance to work together with Singhealth and Department of Emergency (DEM) in Singapore General Hospital (SGH). Singhealth had studied that the current DEM (Department of Emergency) roster needs to be improved in terms of ease of planning and efficiency. Operation research technique was employed to carry out this project. Firstly, the process flow of the DEM roster was mapped out. The problem was later looked upon as an assignment problem and linear programming method was used to tackle the problem. The objectives of the problem were first identified. Later on, the constraints and conditions attached to the problem were analyzed as well. Finally, they were being converted to mathematical equations. These equations were input into spreadsheets which formed the model. Basic solver was used at the beginning stage to test out the roster’s feasibility. Later on, risk solver which is a more advanced software was used to complete the model. The solutions were reviewed at the end after the model had been solved. They met most of the constraints and requirements that DEM wants. However, the author feels that the model can work better on a larger scale advanced solver where unlimited decision variables can be used. An improved version of the new model using advanced solver could be much more desirable than the current DEM roster that the doctors are using.
author2 Rajesh Piplani
author_facet Rajesh Piplani
Yap, Wei Qing.
format Final Year Project
author Yap, Wei Qing.
author_sort Yap, Wei Qing.
title Modelling of roster : optimization of DEM roster at SGH
title_short Modelling of roster : optimization of DEM roster at SGH
title_full Modelling of roster : optimization of DEM roster at SGH
title_fullStr Modelling of roster : optimization of DEM roster at SGH
title_full_unstemmed Modelling of roster : optimization of DEM roster at SGH
title_sort modelling of roster : optimization of dem roster at sgh
publishDate 2009
url http://hdl.handle.net/10356/16201
_version_ 1759852962398601216