Engineering study on harnessing energy using micro hydropower from untapped urban infrastructures

In Singapore, the use of hydropower technology is not feasible due to the lack of fast flowing water. However, this project will explore the feasibility of installing pico-hydropower system and harnessing the flow of water from the inlet of water storage tank located in HDB rooftop. The power harnes...

Full description

Saved in:
Bibliographic Details
Main Author: Lim, Bao Jie
Other Authors: Heng Kok Hui, John Gerard
Format: Final Year Project
Language:English
Published: Nanyang Technological University 2023
Subjects:
Online Access:https://hdl.handle.net/10356/168266
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English