A two-phase iterative mathematical programming-based heuristic for a flexible job shop scheduling problem with transportation

In a flexible job shop problem with transportation (FJSPT), a typical flexible manufacturing system comprises transporters that pick up and deliver jobs for processing at flexible job shops. This problem has grown in importance through the wide use of automated transporters in Industry 4.0. In this...

全面介紹

Saved in:
書目詳細資料
Main Authors: Lim, Che Han, Moon, Seung Ki
其他作者: School of Mechanical and Aerospace Engineering
格式: Article
語言:English
出版: 2023
主題:
在線閱讀:https://hdl.handle.net/10356/169242
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English