Flow shop scheduling of hybrid make-to-stock and make-to-order in a distributed precast concrete production system
Prefabrication is not only economically optimal but also environmentally sustainable; hence, it is the future of construction. Furthermore, mass customization is the future of prefabrication. In the mass customization era, the production paradigm in precast concrete (PC) factories will inevitably sh...
Saved in:
Main Authors: | Chen, Chen, Han, Jinchi, Liu, Ziwen, Tiong, Robert Lee Kong |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Article |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/170020 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Barriers to achieving green precast concrete stock management - A survey of current stock management practices in Singapore
by: Wu, P., et al.
Published: (2014) -
Lean management and low carbon emissions in precast concrete factories in Singapore
by: Wu, P., et al.
Published: (2014) -
Application of the Lean Philosophy to reduce Carbon Emissions in the Precast Concrete Industry of Singapore
by: WU PENG
Published: (2012) -
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
by: Cai, Yiyu, et al.
Published: (2019) -
A project study on pre-fabricated bungalow houses
by: Miranda, Renato L., et al.
Published: (1969)