Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development

This final year report will cover the basic background of Public Private Partnerships (PPP) and how the study of it leads to the development of the PPP Model. The Model is also being put to use by analyzing 3 case studies carefully chosen for this project. The demand for infrastructure investment...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Tze Wei.
Other Authors: Yeo Khim Teck
Format: Final Year Project
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/17144
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-17144
record_format dspace
spelling sg-ntu-dr.10356-171442023-03-04T18:35:55Z Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development Tan, Tze Wei. Yeo Khim Teck School of Mechanical and Aerospace Engineering DRNTU::Engineering::Industrial engineering::Project management This final year report will cover the basic background of Public Private Partnerships (PPP) and how the study of it leads to the development of the PPP Model. The Model is also being put to use by analyzing 3 case studies carefully chosen for this project. The demand for infrastructure investment is ever increasing due to the globalization. Hence to effectively construct infrastructures, a PPP contract is being used to facilities it. The theory of PPP was being discussed in detailed and the various forms of PPP were also being introduced and explained. The various forms of risk were also being introduced because there are a lot of risks involved in a PPP contract. Hence, there is a need to know and understand all the risk. The principle of risk transfer was also being looked into, and it was clearly explained in detail. The PPP Risk Evaluation Model (REM) was being developed after studying these risks. We also looked into the various type of modeling technique and the Soft Systems Methodology (SSM) was chosen. The REM and SSM were then jointly used for pre-construction analysis to analyze these PPP case studies which were being carefully chosen to validate the model. The REM helped to identify the various conceivable risks involved in the projects. This will help the primary stakeholders in the PPP contract to be fully prepared to anticipate and deal with the risks. The overall research and lesson learned will help future PPP planning and development by identifying the risks with ease so that there will be no delay in the constructing the infrastructure. This will also ensure PPP project success for entire completion with an overall and to bring benefits to stakeholders. Bachelor of Engineering (Mechanical Engineering) 2009-06-01T02:33:21Z 2009-06-01T02:33:21Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/17144 en Nanyang Technological University 98 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Industrial engineering::Project management
spellingShingle DRNTU::Engineering::Industrial engineering::Project management
Tan, Tze Wei.
Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
description This final year report will cover the basic background of Public Private Partnerships (PPP) and how the study of it leads to the development of the PPP Model. The Model is also being put to use by analyzing 3 case studies carefully chosen for this project. The demand for infrastructure investment is ever increasing due to the globalization. Hence to effectively construct infrastructures, a PPP contract is being used to facilities it. The theory of PPP was being discussed in detailed and the various forms of PPP were also being introduced and explained. The various forms of risk were also being introduced because there are a lot of risks involved in a PPP contract. Hence, there is a need to know and understand all the risk. The principle of risk transfer was also being looked into, and it was clearly explained in detail. The PPP Risk Evaluation Model (REM) was being developed after studying these risks. We also looked into the various type of modeling technique and the Soft Systems Methodology (SSM) was chosen. The REM and SSM were then jointly used for pre-construction analysis to analyze these PPP case studies which were being carefully chosen to validate the model. The REM helped to identify the various conceivable risks involved in the projects. This will help the primary stakeholders in the PPP contract to be fully prepared to anticipate and deal with the risks. The overall research and lesson learned will help future PPP planning and development by identifying the risks with ease so that there will be no delay in the constructing the infrastructure. This will also ensure PPP project success for entire completion with an overall and to bring benefits to stakeholders.
author2 Yeo Khim Teck
author_facet Yeo Khim Teck
Tan, Tze Wei.
format Final Year Project
author Tan, Tze Wei.
author_sort Tan, Tze Wei.
title Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
title_short Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
title_full Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
title_fullStr Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
title_full_unstemmed Viable risk evaluation model of public-private-partnership (PPP) in infrastructural development
title_sort viable risk evaluation model of public-private-partnership (ppp) in infrastructural development
publishDate 2009
url http://hdl.handle.net/10356/17144
_version_ 1759856173307133952