Modeling and analysis of manufacturing system to improve cycle time and utilization performance
This project aims to study the manufacturing system through modeling and analysis. It is about searching for different ways and solutions in order to improve the cycle time and utilization of a production. The project is built upon on the previous IA experienced by the author in the Shanghai Vent...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/17174 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-17174 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-171742023-03-04T19:10:36Z Modeling and analysis of manufacturing system to improve cycle time and utilization performance Chen, Yuhui. School of Mechanical and Aerospace Engineering Sivakumar Appa Iyer DRNTU::Engineering::Manufacturing::Production management This project aims to study the manufacturing system through modeling and analysis. It is about searching for different ways and solutions in order to improve the cycle time and utilization of a production. The project is built upon on the previous IA experienced by the author in the Shanghai Venture cooperation. All the issues faced during the internship period will serve as an actual case study of the production environment which enables the author to utilize this knowledge to solve some of the problems concerned. The author will delve deeply into the physics of the manufacturing system by conducting research studies at the collaborating company (Singapore Venture cooperation), reviewing precedents or prior work assignments and also doing literature review to determine how different factors will affect the manufacturing system in various aspects such as throughput, cycle time, utilization, etc. In addition, the author will be using a simulation program to simulate the proposed solution in order to understand the pros and cons of it before implementing it on the production line. Thus, by analyzing the scenarios in whole and diagnosing the issues that occurred, the author is able to propose some practical and economical solutions for the problems that arise in the duration of this project. Bachelor of Engineering (Mechanical Engineering) 2009-06-01T04:16:11Z 2009-06-01T04:16:11Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/17174 en Nanyang Technological University 87 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Manufacturing::Production management |
spellingShingle |
DRNTU::Engineering::Manufacturing::Production management Chen, Yuhui. Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
description |
This project aims to study the manufacturing system through modeling and analysis.
It is about searching for different ways and solutions in order to improve the cycle
time and utilization of a production. The project is built upon on the previous IA
experienced by the author in the Shanghai Venture cooperation. All the issues faced
during the internship period will serve as an actual case study of the production
environment which enables the author to utilize this knowledge to solve some of the
problems concerned.
The author will delve deeply into the physics of the manufacturing system by
conducting research studies at the collaborating company (Singapore Venture
cooperation), reviewing precedents or prior work assignments and also doing
literature review to determine how different factors will affect the manufacturing
system in various aspects such as throughput, cycle time, utilization, etc. In addition,
the author will be using a simulation program to simulate the proposed solution in
order to understand the pros and cons of it before implementing it on the production
line. Thus, by analyzing the scenarios in whole and diagnosing the issues that
occurred, the author is able to propose some practical and economical solutions for
the problems that arise in the duration of this project. |
author2 |
School of Mechanical and Aerospace Engineering |
author_facet |
School of Mechanical and Aerospace Engineering Chen, Yuhui. |
format |
Final Year Project |
author |
Chen, Yuhui. |
author_sort |
Chen, Yuhui. |
title |
Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
title_short |
Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
title_full |
Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
title_fullStr |
Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
title_full_unstemmed |
Modeling and analysis of manufacturing system to improve cycle time and utilization performance |
title_sort |
modeling and analysis of manufacturing system to improve cycle time and utilization performance |
publishDate |
2009 |
url |
http://hdl.handle.net/10356/17174 |
_version_ |
1759853627565932544 |