Design & build a protection relay test set
In electrical installations on the main switchboards, protection relays like Overcurrent Relays, Earth Fault Relays, etc. are installed after a Circuit Breaker (CB), designed to trip the respective CB when a fault is detected to protect the end-user / equipment. Shutdown maintenances are carried...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
Nanyang Technological University
2023
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/172690 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-172690 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-1726902023-12-22T15:43:22Z Design & build a protection relay test set Ong, Vivian Yu Qi Ling Keck Voon School of Electrical and Electronic Engineering EKVLING@ntu.edu.sg Engineering::Electrical and electronic engineering::Electric power Engineering::Electrical and electronic engineering::Electric apparatus and materials In electrical installations on the main switchboards, protection relays like Overcurrent Relays, Earth Fault Relays, etc. are installed after a Circuit Breaker (CB), designed to trip the respective CB when a fault is detected to protect the end-user / equipment. Shutdown maintenances are carried out periodically on most electrical installation to test the functionality of components within the electrical installations. As part of the shutdown maintenance work, Secondary Injection (SI) tests are carried out on the protection relays to ensure that the relays are still functioning. Protection relays to be tested can be as much as a hundred relays, all to be tested within a tight time frame. Protection relays found/tested faulty will be highlighted and seek approval from client for immediate replacement. Getting the approval from client will often take time, hence time taken to finish testing all relays is essential. This is to ensure that faulty relays can be replaced within scheduled shutdown timings to avoid delays in restoration of power supply to the estate. The test set that are usually used for the protection relay testing is costly and bulky as it can also carry out other different tests such as Primary Injection test, SI testing of three phase relays which are used in the higher voltage installation. Weighing at more than 20 kilograms (kg), a lot of time and effort is spent moving the bulky and heavy test set around. Regardless of the estate intake capacity, most of them will have a Low Tension (LT) switchboard, up to 400 Volts(V) three-phase line to line, before distribution of power to consumers. Hence, it is very common and mostly only single-phase protection relays to be tested. The other various tests that the bulky test set offers are not required. Hence, the aim of this project is to build a smaller and cheaper SI test set. Bachelor of Engineering (Electrical and Electronic Engineering) 2023-12-18T06:08:53Z 2023-12-18T06:08:53Z 2023 Final Year Project (FYP) Ong, V. Y. Q. (2023). Design & build a protection relay test set. Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/172690 https://hdl.handle.net/10356/172690 en P1003-221 application/pdf Nanyang Technological University |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
Engineering::Electrical and electronic engineering::Electric power Engineering::Electrical and electronic engineering::Electric apparatus and materials |
spellingShingle |
Engineering::Electrical and electronic engineering::Electric power Engineering::Electrical and electronic engineering::Electric apparatus and materials Ong, Vivian Yu Qi Design & build a protection relay test set |
description |
In electrical installations on the main switchboards, protection relays like Overcurrent
Relays, Earth Fault Relays, etc. are installed after a Circuit Breaker (CB), designed to
trip the respective CB when a fault is detected to protect the end-user / equipment.
Shutdown maintenances are carried out periodically on most electrical installation to test
the functionality of components within the electrical installations. As part of the
shutdown maintenance work, Secondary Injection (SI) tests are carried out on the
protection relays to ensure that the relays are still functioning. Protection relays to be
tested can be as much as a hundred relays, all to be tested within a tight time frame.
Protection relays found/tested faulty will be highlighted and seek approval from client
for immediate replacement. Getting the approval from client will often take time, hence
time taken to finish testing all relays is essential. This is to ensure that faulty relays can
be replaced within scheduled shutdown timings to avoid delays in restoration of power
supply to the estate.
The test set that are usually used for the protection relay testing is costly and bulky as it
can also carry out other different tests such as Primary Injection test, SI testing of three
phase relays which are used in the higher voltage installation. Weighing at more than 20
kilograms (kg), a lot of time and effort is spent moving the bulky and heavy test set
around.
Regardless of the estate intake capacity, most of them will have a Low Tension (LT)
switchboard, up to 400 Volts(V) three-phase line to line, before distribution of power to
consumers. Hence, it is very common and mostly only single-phase protection relays to
be tested. The other various tests that the bulky test set offers are not required. Hence, the
aim of this project is to build a smaller and cheaper SI test set. |
author2 |
Ling Keck Voon |
author_facet |
Ling Keck Voon Ong, Vivian Yu Qi |
format |
Final Year Project |
author |
Ong, Vivian Yu Qi |
author_sort |
Ong, Vivian Yu Qi |
title |
Design & build a protection relay test set |
title_short |
Design & build a protection relay test set |
title_full |
Design & build a protection relay test set |
title_fullStr |
Design & build a protection relay test set |
title_full_unstemmed |
Design & build a protection relay test set |
title_sort |
design & build a protection relay test set |
publisher |
Nanyang Technological University |
publishDate |
2023 |
url |
https://hdl.handle.net/10356/172690 |
_version_ |
1787136723255296000 |