Time series prediction of tunnel boring machine (TBM) performance during excavation using causal explainable artificial intelligence (CX-AI)

Since early warning is significant to ensure high-quality tunneling boring machine (TBM) construction, a real-time prediction method based on TBM data is proposed. To solve the “black box” problem of prediction by artificial intelligence (AI) methods, the causal explainable gated recurrent unit (CX-...

Full description

Saved in:
Bibliographic Details
Main Authors: Wang, Kunyu, Zhang, Limao, Fu, Xianlei
Other Authors: School of Civil and Environmental Engineering
Format: Article
Language:English
Published: 2023
Subjects:
Online Access:https://hdl.handle.net/10356/172880
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English