Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
This paper addresses low worker productivity in Prefabricated Bathroom Unit (PBU) production. To improve, a hierarchical two-level model is developed to (1) integrate project scheduling and task assignments, (2) incorporate multi-skilled workers at an individual level with heterogeneous skill scopes...
Saved in:
Main Authors: | Han, Jinchi, Chen, Chen, Tiong, Robert Lee Kong, Wu, Kan |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Article |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/180828 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
by: Tiong, Lee Kong, et al.
Published: (2019) -
A hybrid water flow algorithm for multi-objective flexible flow shop scheduling problems
by: Tran, T.H., et al.
Published: (2014) -
REINFORCEMENT LEARNING BASED SOLUTION APPROACHES FOR INTEGRATED SCHOOL BUS ROUTING AND SCHEDULING PROBLEM
by: EDA KOKSAL AHMED
Published: (2021) -
CRANE PLANNING OPTIMIZATION FOR CONSTRUCTION
by: CHEN CHEN
Published: (2018) -
Structural optimization in civil engineering: A literature review
by: Mei, Linfeng, et al.
Published: (2022)