Simulated annealing for multiple construction project scheduling with multiple resource constraints
Multi-project scheduling is one of the most important and challenging parts of project scheduling. Having multiple projects with activities competing for multiple limited resources is common for almost all construction companies. However, available models can not handle properly scheduling of real m...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/18188 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-18188 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-181882023-03-03T19:25:48Z Simulated annealing for multiple construction project scheduling with multiple resource constraints Seyed Mohsen Shahandashti. Chen Po-Han School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Construction management Multi-project scheduling is one of the most important and challenging parts of project scheduling. Having multiple projects with activities competing for multiple limited resources is common for almost all construction companies. However, available models can not handle properly scheduling of real multiple projects. This research as its main contribution proposes a model for scheduling multiple projects with multiple resource constraints using Simulated Annealing algorithm. This model is more efficient than previously proposed ones since it is not as time consuming and impractical for real cases as exact methods and it is not as sensitive to the problem type as heuristics. This model can be used for a variety of real multi-project scheduling problems and it is easy to reproduce and follow by engineers. Master of Engineering (CEE) 2009-06-24T01:19:19Z 2009-06-24T01:19:19Z 2008 2008 Thesis http://hdl.handle.net/10356/18188 en 148 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Construction management |
spellingShingle |
DRNTU::Engineering::Civil engineering::Construction management Seyed Mohsen Shahandashti. Simulated annealing for multiple construction project scheduling with multiple resource constraints |
description |
Multi-project scheduling is one of the most important and challenging parts of project scheduling. Having multiple projects with activities competing for multiple limited resources is common for almost all construction companies. However, available models can not handle properly scheduling of real multiple projects. This research as its main contribution proposes a model for scheduling multiple projects with multiple resource constraints using Simulated Annealing algorithm. This model is more efficient than previously proposed ones since it is not as time consuming and impractical for real cases as exact methods and it is not as sensitive to the problem type as heuristics. This model can be used for a variety of real multi-project scheduling problems and it is easy to reproduce and follow by engineers. |
author2 |
Chen Po-Han |
author_facet |
Chen Po-Han Seyed Mohsen Shahandashti. |
format |
Theses and Dissertations |
author |
Seyed Mohsen Shahandashti. |
author_sort |
Seyed Mohsen Shahandashti. |
title |
Simulated annealing for multiple construction project scheduling with multiple resource constraints |
title_short |
Simulated annealing for multiple construction project scheduling with multiple resource constraints |
title_full |
Simulated annealing for multiple construction project scheduling with multiple resource constraints |
title_fullStr |
Simulated annealing for multiple construction project scheduling with multiple resource constraints |
title_full_unstemmed |
Simulated annealing for multiple construction project scheduling with multiple resource constraints |
title_sort |
simulated annealing for multiple construction project scheduling with multiple resource constraints |
publishDate |
2009 |
url |
http://hdl.handle.net/10356/18188 |
_version_ |
1759856280138153984 |