Simulation of the management method for producing bridge elements in precasting yard

This thesis concentrates on the study of using computer simulation in the management of a precasting yard producing bridge elements. For this purpose, a computer model simulation was built to simulate the management of material flow and logistic planning pertaining to the precasting yard such as bea...

Full description

Saved in:
Bibliographic Details
Main Author: Ooi, Jit Cheow.
Other Authors: Alum, Jahidul
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19382
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-19382
record_format dspace
spelling sg-ntu-dr.10356-193822020-09-26T21:18:28Z Simulation of the management method for producing bridge elements in precasting yard Ooi, Jit Cheow. Alum, Jahidul Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management This thesis concentrates on the study of using computer simulation in the management of a precasting yard producing bridge elements. For this purpose, a computer model simulation was built to simulate the management of material flow and logistic planning pertaining to the precasting yard such as beam casting operation, beam launching operation, site storage constraints and resources required for each activity. The simulation model is used as a vehicle for experimentation, in a way to demonstrate the likely effects of various activities on to the project duration as well as on to one another. The results obtained are then analysed and tested against actual data. Master of Science (International Construction Management) 2009-12-11T09:00:54Z 2009-12-11T09:00:54Z 1997 1997 Thesis http://hdl.handle.net/10356/19382 en NANYANG TECHNOLOGICAL UNIVERSITY 125 p. application/pdf
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Ooi, Jit Cheow.
Simulation of the management method for producing bridge elements in precasting yard
description This thesis concentrates on the study of using computer simulation in the management of a precasting yard producing bridge elements. For this purpose, a computer model simulation was built to simulate the management of material flow and logistic planning pertaining to the precasting yard such as beam casting operation, beam launching operation, site storage constraints and resources required for each activity. The simulation model is used as a vehicle for experimentation, in a way to demonstrate the likely effects of various activities on to the project duration as well as on to one another. The results obtained are then analysed and tested against actual data.
author2 Alum, Jahidul
author_facet Alum, Jahidul
Ooi, Jit Cheow.
format Theses and Dissertations
author Ooi, Jit Cheow.
author_sort Ooi, Jit Cheow.
title Simulation of the management method for producing bridge elements in precasting yard
title_short Simulation of the management method for producing bridge elements in precasting yard
title_full Simulation of the management method for producing bridge elements in precasting yard
title_fullStr Simulation of the management method for producing bridge elements in precasting yard
title_full_unstemmed Simulation of the management method for producing bridge elements in precasting yard
title_sort simulation of the management method for producing bridge elements in precasting yard
publishDate 2009
url http://hdl.handle.net/10356/19382
_version_ 1681057840045752320