Project management system analysis and redesign
The main purpose of the dissertation is to modify the model project management developed by Dr. G. A.Britton and J. Parker using the Viable System Model, so that it is suitable for the Singapore construction industry.
Saved in:
Main Author: | Tay, Tiak Poh. |
---|---|
Other Authors: | V Shanmuganayagam |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Managing concrete repair projects
by: Loh, Chin Poh.
Published: (2009) -
Building project data management system
by: Chen, Wan Hsiang., et al.
Published: (2011) -
Project management system on piling project (bored-cast-in-place pile)
by: Ng, Lay Hua.
Published: (2009) -
Development of an expert system for construction project management
by: Low, Joo Soon.
Published: (2009) -
Study on the applicability of safety management system in rail project
by: Ching, Stanley Swee Leng.
Published: (2008)