Construction management of temporary works
Temporary works have usually been viewed as an ancillary to the main structural and architectural works. Inadequate emphasis is given to temporary works. More often than not, the temporary works have been intentionally or unintentionally neglected. This is not a desirable outlook as temporary works...
Saved in:
Main Authors: | Ang, Boon Yee, Chen, Kheng Seong |
---|---|
Other Authors: | Lim, Ewe Chye |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19491 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Construction design management in the Singapore construction industry
by: Ling, Boon Kok.
Published: (2008) -
Systematic construction risk management : a case study of Chinatown MRT station and Clarke Quay tunnelling works
by: Chan, Fook Thim., et al.
Published: (2008) -
Construction management of dredging and dumping works in reclamation project: a case study of Pulau Tekong reclamation project
by: Ne Win
Published: (2008) -
Study on aspects of total quality management in Singapore construction industry
by: Ang, Sim Ai
Published: (2011) -
Study on loss and expense claims arising from variation orders using public sector standard conditions of contract for construction works
by: Chan, Sock Yee.
Published: (2008)