A study of BOT and concession-based contracts
The report of this research is to probe wider into the framework of existing BOT and concession-based contracts. Two cases of world renowned and controversial projects were put up and studied from the beginning till the current status of concession implementation. The two cases are the North South E...
Saved in:
Main Author: | Yeoh, Ka Suan. |
---|---|
Other Authors: | Tiong, Robert Lee Kong |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19507 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A study of concession design and risk-return tradeoffs for privately financed infrastructure projects
by: Ye, Sudong.
Published: (2008) -
Performance evaluation of BOT projects
by: Shahul Hameed.
Published: (2009) -
Evaluation of risks in BOT projects
by: Tiong, Robert Lee Kong., et al.
Published: (2008) -
Key issues in BOT project packaging
by: Cheong, Heng Keong.
Published: (2009) -
BOT project opportunities in Asia Pacific
by: Lim, Hong Leong.
Published: (2009)