Risk management of privatised projects
Privatisation of large infrastructure projects has been becoming more common. This study focuses on the report for The Second Stage Expressway System in Bangkok did by Asian Development Bank (ADB). It identifies the risks associated to the project. An independent spreadsheet model was developed to t...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19522 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-19522 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-195222020-09-26T21:14:51Z Risk management of privatised projects Nanthakumar Sivagurunathan Tiong, Robert Lee Kong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management Privatisation of large infrastructure projects has been becoming more common. This study focuses on the report for The Second Stage Expressway System in Bangkok did by Asian Development Bank (ADB). It identifies the risks associated to the project. An independent spreadsheet model was developed to the check accuracy of the ADB's report. Master of Science (International Construction Management) 2009-12-14T05:53:00Z 2009-12-14T05:53:00Z 1994 1994 Thesis http://hdl.handle.net/10356/19522 en NANYANG TECHNOLOGICAL UNIVERSITY 271 p. application/pdf application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Construction management |
spellingShingle |
DRNTU::Engineering::Civil engineering::Construction management Nanthakumar Sivagurunathan Risk management of privatised projects |
description |
Privatisation of large infrastructure projects has been becoming more common. This study focuses on the report for The Second Stage Expressway System in Bangkok did by Asian Development Bank (ADB). It identifies the risks associated to the project. An independent spreadsheet model was developed to the check accuracy of the ADB's report. |
author2 |
Tiong, Robert Lee Kong |
author_facet |
Tiong, Robert Lee Kong Nanthakumar Sivagurunathan |
format |
Theses and Dissertations |
author |
Nanthakumar Sivagurunathan |
author_sort |
Nanthakumar Sivagurunathan |
title |
Risk management of privatised projects |
title_short |
Risk management of privatised projects |
title_full |
Risk management of privatised projects |
title_fullStr |
Risk management of privatised projects |
title_full_unstemmed |
Risk management of privatised projects |
title_sort |
risk management of privatised projects |
publishDate |
2009 |
url |
http://hdl.handle.net/10356/19522 |
_version_ |
1681056492199870464 |