A study of productivity and buildability in the construction industry
Productivity is one of the most frequently discussed topics in the construction industry. Productivity can be translated into costs and ultimately into contractor's profits or loss on the project. However, very little is being done on many projects to identify the direct and indirect effects of...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19532 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | Productivity is one of the most frequently discussed topics in the construction industry. Productivity can be translated into costs and ultimately into contractor's profits or loss on the project. However, very little is being done on many projects to identify the direct and indirect effects of productivity on running a project efficiently. The objective of this report is to examine the impact of management and the formwork system which are very important issues to be dealt with right from the onset of initiating a project. |
---|