Cost, time and quality aspects of primary schools in Singapore
This dissertation is primarily a report based on the findings from case studies of cost, time and quality aspects of 8 primary schools built in Singapore under the 4th Phase Primary School Building Programme (1991 to 1994). The report covers the examination and evaluation of the key factors, the eff...
Saved in:
Main Author: | Chan, Seng Kee. |
---|---|
Other Authors: | Lim, Ewe Chye |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19544 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Study on aspects of total quality management in Singapore construction industry
by: Ang, Sim Ai
Published: (2011) -
Aspects of cost reduction for highway bridges in Myanmar
by: Singh, Dharmendar.
Published: (2008) -
Productivity aspects of bored piling operations in Singapore
by: Lee, Hong Keow., et al.
Published: (2009) -
Contractual and legal aspects and risks of design and build projects in Singapore
by: Lim, Heng Loong., et al.
Published: (2008) -
Time/cost performance ratio modelling for estimation and project evaluation
by: Goh, Ngan Hong.
Published: (2009)