Using modeling and simulation for scheduling of test cell in an electronic company

The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers o...

全面介紹

Saved in:
書目詳細資料
主要作者: Cheng, Yau Tong.
其他作者: Lee, Stephen Siang Guan
格式: Theses and Dissertations
語言:English
出版: 2009
主題:
在線閱讀:http://hdl.handle.net/10356/19995
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id sg-ntu-dr.10356-19995
record_format dspace
spelling sg-ntu-dr.10356-199952023-03-11T17:28:29Z Using modeling and simulation for scheduling of test cell in an electronic company Cheng, Yau Tong. Lee, Stephen Siang Guan School of Mechanical and Production Engineering DRNTU::Engineering::Manufacturing The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers on time at all times while maintaining maximum machine utilization and minimum inventory. The management will have to weigh between urgent parts and normal parts; between clearing deliquent line items and meeting due-date of current parts; between major customers and minor customers. Master of Science (Computer Integrated Manufacturing) 2009-12-14T07:55:06Z 2009-12-14T07:55:06Z 1996 1996 Thesis http://hdl.handle.net/10356/19995 en NANYANG TECHNOLOGICAL UNIVERSITY 260 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Manufacturing
spellingShingle DRNTU::Engineering::Manufacturing
Cheng, Yau Tong.
Using modeling and simulation for scheduling of test cell in an electronic company
description The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers on time at all times while maintaining maximum machine utilization and minimum inventory. The management will have to weigh between urgent parts and normal parts; between clearing deliquent line items and meeting due-date of current parts; between major customers and minor customers.
author2 Lee, Stephen Siang Guan
author_facet Lee, Stephen Siang Guan
Cheng, Yau Tong.
format Theses and Dissertations
author Cheng, Yau Tong.
author_sort Cheng, Yau Tong.
title Using modeling and simulation for scheduling of test cell in an electronic company
title_short Using modeling and simulation for scheduling of test cell in an electronic company
title_full Using modeling and simulation for scheduling of test cell in an electronic company
title_fullStr Using modeling and simulation for scheduling of test cell in an electronic company
title_full_unstemmed Using modeling and simulation for scheduling of test cell in an electronic company
title_sort using modeling and simulation for scheduling of test cell in an electronic company
publishDate 2009
url http://hdl.handle.net/10356/19995
_version_ 1761781950444470272