Using modeling and simulation for scheduling of test cell in an electronic company
The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers o...
Saved in:
Main Author: | Cheng, Yau Tong. |
---|---|
Other Authors: | Lee, Stephen Siang Guan |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Foundry production scheduling by Adexa in an oilfield service company
by: Wang, Xiaojun
Published: (2014) -
The production scheduling using economic lot sizing approach at a pharmaceutical company.
by: Sumit, Gupta.
Published: (2008) -
Trend of Singapre electronics manufacturing : company of the future
by: Wong, Yeow Kong.
Published: (2008) -
A simulation-based study of scheduling policies to improve the factory performance
by: Li, Meng
Published: (2014) -
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach
by: Zuo, Jie
Published: (2014)