Plant maintenance system

This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section al...

Full description

Saved in:
Bibliographic Details
Main Authors: Lee, Carmen Mun Yi, Lim, Yijin, Neha Saoji
Other Authors: Damien Joseph
Format: Final Year Project
Language:English
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10356/21212
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-21212
record_format dspace
spelling sg-ntu-dr.10356-212122023-05-19T06:08:58Z Plant maintenance system Lee, Carmen Mun Yi Lim, Yijin Neha Saoji Damien Joseph Nanyang Business School KB Associates Pte Ltd DRNTU::Business::Operations management This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project. The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design and physical design of the proposed system. Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd. BUSINESS 2010-03-23T01:22:35Z 2010-03-23T01:22:35Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/21212 en Nanyang Technological University 89 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Business::Operations management
spellingShingle DRNTU::Business::Operations management
Lee, Carmen Mun Yi
Lim, Yijin
Neha Saoji
Plant maintenance system
description This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project. The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design and physical design of the proposed system. Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd.
author2 Damien Joseph
author_facet Damien Joseph
Lee, Carmen Mun Yi
Lim, Yijin
Neha Saoji
format Final Year Project
author Lee, Carmen Mun Yi
Lim, Yijin
Neha Saoji
author_sort Lee, Carmen Mun Yi
title Plant maintenance system
title_short Plant maintenance system
title_full Plant maintenance system
title_fullStr Plant maintenance system
title_full_unstemmed Plant maintenance system
title_sort plant maintenance system
publishDate 2010
url http://hdl.handle.net/10356/21212
_version_ 1770564606865965056