Report on industrial attachment with Starhub
This report is written to summarize 24 weeks of industrial training received by the author during the industrial attachment program with StarHub Pte Ltd. It encompasses the author?s involvement in four major projects of StarHub Pte Ltd, namely: GIS Data Capture, Sales of Plant Map Flowchart, Netcon...
Saved in:
Main Author: | Natalia Filo Sutanto |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Industrial Attachment (IA) |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/3079 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Industrial attachment report
by: He, Li
Published: (2013) -
Report on industrial attachment with Singapore Telecom
by: Chen, Junhua.
Published: (2008) -
Report on industrial attachment with IBM Corporation
by: Tang, Hualin.
Published: (2008) -
Report on industrial attachment at IBM Corporation
by: Lim, Han Boon.
Published: (2008) -
Report on industrial attachment with Institute of Microelectronics
by: Wang, Ting.
Published: (2009)