Report on industrial attachment with Singapore Telecom

Author handled three project in the attachment period: DNS problem, WAP problem and monitoring system.

Saved in:
Bibliographic Details
Main Author: Chen, Junhua.
Other Authors: School of Electrical and Electronic Engineering
Format: Industrial Attachment (IA)
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/3102
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-3102
record_format dspace
spelling sg-ntu-dr.10356-31022023-07-07T15:44:02Z Report on industrial attachment with Singapore Telecom Chen, Junhua. School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering Author handled three project in the attachment period: DNS problem, WAP problem and monitoring system. 2008-09-17T09:20:35Z 2008-09-17T09:20:35Z 2001 2001 Industrial Attachment (IA) http://hdl.handle.net/10356/3102 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Electrical and electronic engineering
spellingShingle DRNTU::Engineering::Electrical and electronic engineering
Chen, Junhua.
Report on industrial attachment with Singapore Telecom
description Author handled three project in the attachment period: DNS problem, WAP problem and monitoring system.
author2 School of Electrical and Electronic Engineering
author_facet School of Electrical and Electronic Engineering
Chen, Junhua.
format Industrial Attachment (IA)
author Chen, Junhua.
author_sort Chen, Junhua.
title Report on industrial attachment with Singapore Telecom
title_short Report on industrial attachment with Singapore Telecom
title_full Report on industrial attachment with Singapore Telecom
title_fullStr Report on industrial attachment with Singapore Telecom
title_full_unstemmed Report on industrial attachment with Singapore Telecom
title_sort report on industrial attachment with singapore telecom
publishDate 2008
url http://hdl.handle.net/10356/3102
_version_ 1772825656580636672