Effects of TCSC and TCPAR on the operation of competitive power markets
Vertically integrated utilities that controlled the generation, transmission, and distribution of electricity, are being transformed into deregulated, separate generation, transmission and distribution companies in open electricity markets. The heart of restructuring is the competition in the tradin...
Saved in:
Main Author: | Wang, Feng |
---|---|
Other Authors: | Shrestha, Govinda Bol |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/3650 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Wind power generation in competitive power markets
by: Chua, Bryan Aik Ching.
Published: (2009) -
Generation scheduling for a price taker genco in competitive power markets
by: Qiao, Song Bo
Published: (2009) -
Bidding strategy for gencos in competitive markets
by: Cheung, Ki Cheong.
Published: (2010) -
Aspects of generation planning in competitive electricity markets
by: Bikal Kumar Pokharel
Published: (2008) -
Impacts of large-scale wind farms on power system operation
by: Wee, Xi Jie.
Published: (2009)