Real-time channel recovery by using shared backup paths

This research work proposes a resource shared restoration scheme in which the path of a backup connection is selected only if the required reliability level of the session connection can be achieved. First, we describe a mechanism to activate the backup connections by assigning them the backup resou...

Full description

Saved in:
Bibliographic Details
Main Author: Waqas Ahmad.
Other Authors: Ng, Jim Mee
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/3718
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-3718
record_format dspace
spelling sg-ntu-dr.10356-37182023-07-04T15:08:46Z Real-time channel recovery by using shared backup paths Waqas Ahmad. Ng, Jim Mee School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems This research work proposes a resource shared restoration scheme in which the path of a backup connection is selected only if the required reliability level of the session connection can be achieved. First, we describe a mechanism to activate the backup connections by assigning them the backup resources on the links on their paths. (Dr. Ng Jim Mee) Master of Science (Communication and Network Systems) 2008-09-17T09:35:51Z 2008-09-17T09:35:51Z 2002 2002 Thesis http://hdl.handle.net/10356/3718 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems
Waqas Ahmad.
Real-time channel recovery by using shared backup paths
description This research work proposes a resource shared restoration scheme in which the path of a backup connection is selected only if the required reliability level of the session connection can be achieved. First, we describe a mechanism to activate the backup connections by assigning them the backup resources on the links on their paths. (Dr. Ng Jim Mee)
author2 Ng, Jim Mee
author_facet Ng, Jim Mee
Waqas Ahmad.
format Theses and Dissertations
author Waqas Ahmad.
author_sort Waqas Ahmad.
title Real-time channel recovery by using shared backup paths
title_short Real-time channel recovery by using shared backup paths
title_full Real-time channel recovery by using shared backup paths
title_fullStr Real-time channel recovery by using shared backup paths
title_full_unstemmed Real-time channel recovery by using shared backup paths
title_sort real-time channel recovery by using shared backup paths
publishDate 2008
url http://hdl.handle.net/10356/3718
_version_ 1772825191327465472