Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels

Kallang Paya Lebar Expressway is Asia’s longest tunnel. Traffic incidents within the expressway are critical and can cause danger to the drivers. To minimize the danger of the incidents, KPE has done many safety measures. In this report, statistical analysis of the characteristics of the response t...

Full description

Saved in:
Bibliographic Details
Main Author: Chow, Fang Xiang.
Other Authors: Gopinath Menon
Format: Final Year Project
Language:English
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10356/38635
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-38635
record_format dspace
spelling sg-ntu-dr.10356-386352023-03-03T17:18:03Z Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels Chow, Fang Xiang. Gopinath Menon School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Transportation Kallang Paya Lebar Expressway is Asia’s longest tunnel. Traffic incidents within the expressway are critical and can cause danger to the drivers. To minimize the danger of the incidents, KPE has done many safety measures. In this report, statistical analysis of the characteristics of the response time will be done on the Vehicle Recovery services (VRS) crews and LTA Traffic Marshals of KPE. The data are obtained during the author’s visit to the KPE operations center. Comparison of the mean response time will be conducted for different situations using t statistic hypothesis testing. The results achieved show that there are no differences in the mean response time during the peak hours compared to the off peak hours and weekends compared to weekdays. The availability of the Kallang Paya Lebar Expressway is computed based on the data for the month of February and May. With a ratio of availability 0.97 and 0.9, the KPE has more than 90% of the time operating in perfect conditions. There have been many incidents happening in the Kallang Paya Lebar Expressway. It is observed that there is little or weak correlation between the occurrence of each incident. There are no definite patterns and is unable to predict when accidents will happen based on the data. Bachelor of Engineering (Civil) 2010-05-14T03:18:05Z 2010-05-14T03:18:05Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/38635 en Nanyang Technological University 48 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Transportation
spellingShingle DRNTU::Engineering::Civil engineering::Transportation
Chow, Fang Xiang.
Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
description Kallang Paya Lebar Expressway is Asia’s longest tunnel. Traffic incidents within the expressway are critical and can cause danger to the drivers. To minimize the danger of the incidents, KPE has done many safety measures. In this report, statistical analysis of the characteristics of the response time will be done on the Vehicle Recovery services (VRS) crews and LTA Traffic Marshals of KPE. The data are obtained during the author’s visit to the KPE operations center. Comparison of the mean response time will be conducted for different situations using t statistic hypothesis testing. The results achieved show that there are no differences in the mean response time during the peak hours compared to the off peak hours and weekends compared to weekdays. The availability of the Kallang Paya Lebar Expressway is computed based on the data for the month of February and May. With a ratio of availability 0.97 and 0.9, the KPE has more than 90% of the time operating in perfect conditions. There have been many incidents happening in the Kallang Paya Lebar Expressway. It is observed that there is little or weak correlation between the occurrence of each incident. There are no definite patterns and is unable to predict when accidents will happen based on the data.
author2 Gopinath Menon
author_facet Gopinath Menon
Chow, Fang Xiang.
format Final Year Project
author Chow, Fang Xiang.
author_sort Chow, Fang Xiang.
title Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
title_short Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
title_full Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
title_fullStr Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
title_full_unstemmed Traffic and operational characteristics of Kallang-Paya Lebar expressway tunnels
title_sort traffic and operational characteristics of kallang-paya lebar expressway tunnels
publishDate 2010
url http://hdl.handle.net/10356/38635
_version_ 1759853771991547904