Risk assessment of siting a nuclear power plant

To have a nuclear power plant sited in an underground cavern is a great solution to contain any forms of radiation leakages. Not only subsurface nuclear power plant provides many exclusive benefits not available to surface plants, it brings about many unforeseen disadvantages as well. It is...

Full description

Saved in:
Bibliographic Details
Main Author: Chua, Zheng Da.
Other Authors: Fan Sau Cheong
Format: Final Year Project
Language:English
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10356/38636
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-38636
record_format dspace
spelling sg-ntu-dr.10356-386362023-03-03T17:14:29Z Risk assessment of siting a nuclear power plant Chua, Zheng Da. Fan Sau Cheong School of Civil and Environmental Engineering DRNTU::Engineering::Environmental engineering::Environmental protection To have a nuclear power plant sited in an underground cavern is a great solution to contain any forms of radiation leakages. Not only subsurface nuclear power plant provides many exclusive benefits not available to surface plants, it brings about many unforeseen disadvantages as well. It is then necessary to mitigate these limitations to ensure a higher level of safety. PMBR technology is also looked into to gain insights of the technical capabilities and limitations of this nuclear technology. On top of that, building resources such as concrete, steel and soil are all considered and explored in various aspects. Likewise, operational considerations such as evacuation, security and fire-fighting capabilities in an underground context are discussed too. Ultimately, the correct design of cavern, the right soil profile along with the necessary building materials and acceptable operational procedures are vital to ensure the highest safety standard for a nuclear power plant sited underground. While all the possibilities are theoretically extrapolated, experimental data should be collected for further verification. Bachelor of Engineering (Civil) 2010-05-14T03:22:26Z 2010-05-14T03:22:26Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/38636 en Nanyang Technological University 66 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Environmental engineering::Environmental protection
spellingShingle DRNTU::Engineering::Environmental engineering::Environmental protection
Chua, Zheng Da.
Risk assessment of siting a nuclear power plant
description To have a nuclear power plant sited in an underground cavern is a great solution to contain any forms of radiation leakages. Not only subsurface nuclear power plant provides many exclusive benefits not available to surface plants, it brings about many unforeseen disadvantages as well. It is then necessary to mitigate these limitations to ensure a higher level of safety. PMBR technology is also looked into to gain insights of the technical capabilities and limitations of this nuclear technology. On top of that, building resources such as concrete, steel and soil are all considered and explored in various aspects. Likewise, operational considerations such as evacuation, security and fire-fighting capabilities in an underground context are discussed too. Ultimately, the correct design of cavern, the right soil profile along with the necessary building materials and acceptable operational procedures are vital to ensure the highest safety standard for a nuclear power plant sited underground. While all the possibilities are theoretically extrapolated, experimental data should be collected for further verification.
author2 Fan Sau Cheong
author_facet Fan Sau Cheong
Chua, Zheng Da.
format Final Year Project
author Chua, Zheng Da.
author_sort Chua, Zheng Da.
title Risk assessment of siting a nuclear power plant
title_short Risk assessment of siting a nuclear power plant
title_full Risk assessment of siting a nuclear power plant
title_fullStr Risk assessment of siting a nuclear power plant
title_full_unstemmed Risk assessment of siting a nuclear power plant
title_sort risk assessment of siting a nuclear power plant
publishDate 2010
url http://hdl.handle.net/10356/38636
_version_ 1759857200366354432