Nodal reliability and nodal price in deregulated power markets

Electric utilities are experiencing restructuring throughout the world. The main objectives of power system restructuring are to introduce competition in the power industry and to provide more choices to market participants in the way they trade electricity and ancillary services. The direct consequ...

Full description

Saved in:
Bibliographic Details
Main Author: Yi, Ding
Other Authors: Wang Peng
Format: Thesis-Doctor of Philosophy
Language:English
Published: Nanyang Technological University 2008
Subjects:
Online Access:https://hdl.handle.net/10356/3895
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-3895
record_format dspace
spelling sg-ntu-dr.10356-38952023-07-04T16:43:14Z Nodal reliability and nodal price in deregulated power markets Yi, Ding Wang Peng School of Electrical and Electronic Engineering epwang@ntu.edu.sg DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries Electric utilities are experiencing restructuring throughout the world. The main objectives of power system restructuring are to introduce competition in the power industry and to provide more choices to market participants in the way they trade electricity and ancillary services. The direct consequences of the restructuring are the economical separation of conventional vertically integrated utilities into independent generation, transmission and distribution companies. Economic segregation and service unbundling have changed the mechanism of conventional system planning and operations. In restructured power systems, customers could select their power and reserve providers to satisfy their price and reliability expectations. Customer choices have changed the fundamental of system reliability management. The reliability techniques used in a conventional power system cannot be directly applied in the new environments. Moreover electricity pricing in a restructured power system has become a major problem due to the changes in market structure. It is therefore necessary to develop the new techniques and to improve the existing techniques for the planning and operation of restructured power systems. This essay focuses on reliability and price issues of restructured power systems. The reliability and pricing issues in the restructured electric power systems have been investigated in the research work. The existing techniques for the reliability evaluation of the conventional power system have been studied. The optimal dispatch techniques in the competitive electric power systems have been introduced. The techniques, which are based on reliability network equivalent techniques and pseudo-sequential simulation techniques to evaluate reliability indices for a restructured power system with a bilateral market structure have been proposed. A technique to evaluate nodal prices and nodal reliabilities considering the correlation between price and reliability in a restructured power system with Poolco market model has been developed. The reliability network equivalents and the improved optimal power flow models to evaluate reliabilities and prices in a restructured power system with the hybrid market structure have been presented. The nodal price decomposition technique has been investigated and extended to precisely analyze the influence of system outage to the nodal prices. Based on the nodal price decomposition technique a penalty schema for reducing electricity price volatility has been proposed. A technique to determine optimal reserve structure of a restructured power generating system has been developed to incorporate system economics in reliability evaluation. Doctor of Philosophy 2008-09-17T09:39:51Z 2008-09-17T09:39:51Z 2006 2006 Thesis-Doctor of Philosophy Yi, D. (2006). Nodal reliability and nodal price in deregulated power markets. Doctoral thesis, Nanyang Technological University, Singapore. https://hdl.handle.net/10356/3895 10.32657/10356/3895 en This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0). application/pdf Nanyang Technological University
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
Yi, Ding
Nodal reliability and nodal price in deregulated power markets
description Electric utilities are experiencing restructuring throughout the world. The main objectives of power system restructuring are to introduce competition in the power industry and to provide more choices to market participants in the way they trade electricity and ancillary services. The direct consequences of the restructuring are the economical separation of conventional vertically integrated utilities into independent generation, transmission and distribution companies. Economic segregation and service unbundling have changed the mechanism of conventional system planning and operations. In restructured power systems, customers could select their power and reserve providers to satisfy their price and reliability expectations. Customer choices have changed the fundamental of system reliability management. The reliability techniques used in a conventional power system cannot be directly applied in the new environments. Moreover electricity pricing in a restructured power system has become a major problem due to the changes in market structure. It is therefore necessary to develop the new techniques and to improve the existing techniques for the planning and operation of restructured power systems. This essay focuses on reliability and price issues of restructured power systems. The reliability and pricing issues in the restructured electric power systems have been investigated in the research work. The existing techniques for the reliability evaluation of the conventional power system have been studied. The optimal dispatch techniques in the competitive electric power systems have been introduced. The techniques, which are based on reliability network equivalent techniques and pseudo-sequential simulation techniques to evaluate reliability indices for a restructured power system with a bilateral market structure have been proposed. A technique to evaluate nodal prices and nodal reliabilities considering the correlation between price and reliability in a restructured power system with Poolco market model has been developed. The reliability network equivalents and the improved optimal power flow models to evaluate reliabilities and prices in a restructured power system with the hybrid market structure have been presented. The nodal price decomposition technique has been investigated and extended to precisely analyze the influence of system outage to the nodal prices. Based on the nodal price decomposition technique a penalty schema for reducing electricity price volatility has been proposed. A technique to determine optimal reserve structure of a restructured power generating system has been developed to incorporate system economics in reliability evaluation.
author2 Wang Peng
author_facet Wang Peng
Yi, Ding
format Thesis-Doctor of Philosophy
author Yi, Ding
author_sort Yi, Ding
title Nodal reliability and nodal price in deregulated power markets
title_short Nodal reliability and nodal price in deregulated power markets
title_full Nodal reliability and nodal price in deregulated power markets
title_fullStr Nodal reliability and nodal price in deregulated power markets
title_full_unstemmed Nodal reliability and nodal price in deregulated power markets
title_sort nodal reliability and nodal price in deregulated power markets
publisher Nanyang Technological University
publishDate 2008
url https://hdl.handle.net/10356/3895
_version_ 1772829027117039616