Catenary action on RC beams subjected to missing column scenario
Progressive collapse is becoming a major issue globally after the collapse of Ronan Point apartment building (1968) and the recent one, World Trade Centre (2001). The ability to mitigate it has become a main concern. Alternate load path (ALP) method is widely used in current building codes and the g...
Saved in:
Main Author: | Kuan, Ian U. |
---|---|
Other Authors: | Tan Kang Hai |
Format: | Final Year Project |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/39845 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Catenary action of reinforced concrete beams subjected to missing column scenario
by: Lim, You Gen.
Published: (2010) -
The behavior of steel beam-column joints subjected to catenary action
by: Willie, Fionna.
Published: (2011) -
Catenary action of beam to column steel connections
by: Angsori, Hendra
Published: (2011) -
Experimental study on catenary action of RC beam-column subassemblages
by: Yu, Jun, et al.
Published: (2013) -
Catenary action of RC beam-column joints in sub-assemblies
by: Chee, Bernard Chian Wai.
Published: (2011)