Effect of scour-blocker on a submarine pipeline
Scour under submarine pipelines is a serious problem for industrial and environmental concerns. Hence, to search for a method to mitigate the extent of the scour is urgent. This report provides an approach that potentially can lower the possibility of the break of pipeline due to local scour by slow...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/39946 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-39946 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-399462023-03-03T16:53:26Z Effect of scour-blocker on a submarine pipeline Zhang, Xiao Yue Chiew Yee Meng School of Civil and Environmental Engineering Nanyang Environment and Water Research Institute DRNTU::Engineering::Civil engineering::Water resources DRNTU::Engineering::Civil engineering::Structures and design Scour under submarine pipelines is a serious problem for industrial and environmental concerns. Hence, to search for a method to mitigate the extent of the scour is urgent. This report provides an approach that potentially can lower the possibility of the break of pipeline due to local scour by slowing down the scour propagation velocity. A device named scour-blocker is developed and expected to block the propagation of the scour hole. A series of experiment is conducted to test the effect of such a device. By comparing the scour propagation velocity for a pipeline with and without the use of the blocking device, two prominent findings are obtained: 1) The use of scour-blocker on the pipeline can stop the lateral propagation of a neighboring scour hole for a period of time compared to not using it. 2) The blocking time of a scour-blocker increases with its thickness, which means that how well the blocker functions to delay the scour propagation is very much related to the thickness of the blocker. Bachelor of Engineering (Environmental Engineering) 2010-06-08T04:32:59Z 2010-06-08T04:32:59Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/39946 en Nanyang Technological University 37 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Water resources DRNTU::Engineering::Civil engineering::Structures and design |
spellingShingle |
DRNTU::Engineering::Civil engineering::Water resources DRNTU::Engineering::Civil engineering::Structures and design Zhang, Xiao Yue Effect of scour-blocker on a submarine pipeline |
description |
Scour under submarine pipelines is a serious problem for industrial and environmental concerns. Hence, to search for a method to mitigate the extent of the scour is urgent. This report provides an approach that potentially can lower the possibility of the break of pipeline due to local scour by slowing down the scour propagation velocity. A device named scour-blocker is developed and expected to block the propagation of the scour hole. A series of experiment is conducted to test the effect of such a device. By comparing the scour propagation velocity for a pipeline with and without the use of the blocking device, two prominent findings are obtained: 1) The use of scour-blocker on the pipeline can stop the lateral propagation of a neighboring scour hole for a period of time compared to not using it. 2) The blocking time of a scour-blocker increases with its thickness, which means that how well the blocker functions to delay the scour propagation is very much related to the thickness of the blocker. |
author2 |
Chiew Yee Meng |
author_facet |
Chiew Yee Meng Zhang, Xiao Yue |
format |
Final Year Project |
author |
Zhang, Xiao Yue |
author_sort |
Zhang, Xiao Yue |
title |
Effect of scour-blocker on a submarine pipeline |
title_short |
Effect of scour-blocker on a submarine pipeline |
title_full |
Effect of scour-blocker on a submarine pipeline |
title_fullStr |
Effect of scour-blocker on a submarine pipeline |
title_full_unstemmed |
Effect of scour-blocker on a submarine pipeline |
title_sort |
effect of scour-blocker on a submarine pipeline |
publishDate |
2010 |
url |
http://hdl.handle.net/10356/39946 |
_version_ |
1759853053276585984 |