Bidding strategy for gencos in competitive markets

In the deregulated power market, bidding strategy plays an important part in most activities of the generator companies (Gencos). It has the objective in maximizing the profit of the Gencos through bidding strategy involved. The bidding strategy is being formulated through various processes, from lo...

Full description

Saved in:
Bibliographic Details
Main Author: Cheung, Ki Cheong.
Other Authors: Govinda Bol Shrestha
Format: Final Year Project
Language:English
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10356/40273
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-40273
record_format dspace
spelling sg-ntu-dr.10356-402732023-07-07T17:48:11Z Bidding strategy for gencos in competitive markets Cheung, Ki Cheong. Govinda Bol Shrestha School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries In the deregulated power market, bidding strategy plays an important part in most activities of the generator companies (Gencos). It has the objective in maximizing the profit of the Gencos through bidding strategy involved. The bidding strategy is being formulated through various processes, from load forecasting to price based unit commitment, so as to allow Gencos to make the most suitable decision for their existing investments. In this project, the various processes will be investigated, including load forecasting, price forecasting, price based unit commitment, in the electricity market. Load forecasting is usually based on time factor, weather factor and economic factor. Forecasted load then will be needed for forecasting price of electricity, as price is driven by the load demand of the power system most of the time. There are other factors contributing to the electricity prices, such as system outages and the effect from the Gencos’ bidding strategies adopted. Price based unit commitment come into play as it is used to maximize Gencos’ profits through scheduling of generation resources under market prices. Factors such as characteristics of generators and price uncertainty will need to be considered. Bachelor of Engineering 2010-06-14T04:46:05Z 2010-06-14T04:46:05Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/40273 en Nanyang Technological University 52 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
Cheung, Ki Cheong.
Bidding strategy for gencos in competitive markets
description In the deregulated power market, bidding strategy plays an important part in most activities of the generator companies (Gencos). It has the objective in maximizing the profit of the Gencos through bidding strategy involved. The bidding strategy is being formulated through various processes, from load forecasting to price based unit commitment, so as to allow Gencos to make the most suitable decision for their existing investments. In this project, the various processes will be investigated, including load forecasting, price forecasting, price based unit commitment, in the electricity market. Load forecasting is usually based on time factor, weather factor and economic factor. Forecasted load then will be needed for forecasting price of electricity, as price is driven by the load demand of the power system most of the time. There are other factors contributing to the electricity prices, such as system outages and the effect from the Gencos’ bidding strategies adopted. Price based unit commitment come into play as it is used to maximize Gencos’ profits through scheduling of generation resources under market prices. Factors such as characteristics of generators and price uncertainty will need to be considered.
author2 Govinda Bol Shrestha
author_facet Govinda Bol Shrestha
Cheung, Ki Cheong.
format Final Year Project
author Cheung, Ki Cheong.
author_sort Cheung, Ki Cheong.
title Bidding strategy for gencos in competitive markets
title_short Bidding strategy for gencos in competitive markets
title_full Bidding strategy for gencos in competitive markets
title_fullStr Bidding strategy for gencos in competitive markets
title_full_unstemmed Bidding strategy for gencos in competitive markets
title_sort bidding strategy for gencos in competitive markets
publishDate 2010
url http://hdl.handle.net/10356/40273
_version_ 1772825613338411008