An ISA-95-based production scheduling system for high-mix,low-volume manufacturing
Globalization is changing the way companies do business. Goods are getting cheaper and cheaper with the lowering down of trade barriers between countries. The challenges that companies faced will be system to meet ever changing off threat from rival. This has cause companies to look more closely...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/40522 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | Globalization is changing the way companies do business. Goods are getting cheaper
and cheaper with the lowering down of trade barriers between countries. The challenges
that companies faced will be
system to meet ever changing
off threat from rival. This has cause companies to look more closely into how to
integrate their manufacturing system with that of their enterprise systems.
In the 1990s, manufacturing org
with high cost and low probability of succes
standard used in their various system like enterprise resource
supply chain. This has become a challenge for organization
same standard. Since then there is a demand for a generic and simple standard to apply
across all applications in an enterprise systems. Responding to the pressure to
companies turn to the use of
This project performs an in
application for the Production Planning and Scheduling domain
applications are designed with the same standard and
different systems. In addition the author has created an interface to allow developer and
end users to make use of it to make their own system ISA
has made it simple and easy for users to understand and implement ISA
FYP: An ISA-95-Based Production Scheduling
System for High-Mix, Low
Abstract
to find methods to lower manufacturing cost
market demand so as to remain competitive and to
. anufacturing organizations attempt to integrate their systems are
success due to the involvement of different
planning, scheduling and
to base their
ISA-95 standard to integrate their systems.
in-depth investigation of the ISA-95 standar
ed make it easy to be integrated into
ISA-95 compliance. This interface
mple Low-Volume Manufacturing
iii
and a flexible
fend
ir faced
integration on a
cut cost,
standard and its
so that every
ISA-95 standards. |
---|