Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd

This report presents the summary of the work done by the author during the 22 weeks of his Industrial Attachment with ExxonMobil. The basic nature of the work was in the area of Information Technology in the Plant Computing Department of ExxonMobil’s Singapore Refinery. The report first introduces t...

Full description

Saved in:
Bibliographic Details
Main Author: Adi Dahiya
Other Authors: Zhang Cishen
Format: Industrial Attachment (IA)
Language:English
Published: 2010
Subjects:
Online Access:http://hdl.handle.net/10356/42303
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-42303
record_format dspace
spelling sg-ntu-dr.10356-423032023-07-07T15:48:31Z Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd Adi Dahiya Zhang Cishen School of Electrical and Electronic Engineering ExxonMobil Asia Pacific Pte. Ltd. DRNTU::Engineering::Electrical and electronic engineering This report presents the summary of the work done by the author during the 22 weeks of his Industrial Attachment with ExxonMobil. The basic nature of the work was in the area of Information Technology in the Plant Computing Department of ExxonMobil’s Singapore Refinery. The report first introduces the basic information about ExxonMobil as a company and its operations in Singapore. The chapters that follow describe in detail the work produced by the author. The first project (section 2.1) describes the development of the Mogas DBSCN Accounting System – a standalone application developed by the user to track components blended in the Motor Gasoline (Mogas) pool in the refinery. The second project (section 2.2) exhibits the application developed by the author to serve as a business continuity model for the ExxonMobil Berth Allocation System. This application ensures the continuity and speediness of shipping transactions at ExxonMobil’s berths in case of the failure of the main application. The third project (section 2.3) enumerates the various support and troubleshooting tasks undertaken by the author. These talks not only enhanced the IT expertise of the author, but also ensured the continued reliability of network infrastructure in the refinery. Apart from the major projects, the author took the initiative to be a part of various Project Management related tasks – e.g. Risk Assessments – in his sections. The author also contributed to ExxonMobil’s safety culture by delivering February 2009’s Safety Talk to the Plant Computing Group and to conduct numerous safety observations and walkabouts in the refinery. In order to ensure brevity and contextual accuracy, the sections requiring greater detailed have been cataloged as appendices at the end of the report. 0 2010-10-26T01:20:51Z 2010-10-26T01:20:51Z 2009 2009 Industrial Attachment (IA) http://hdl.handle.net/10356/42303 en Nanyang Technological University 96 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering
spellingShingle DRNTU::Engineering::Electrical and electronic engineering
Adi Dahiya
Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
description This report presents the summary of the work done by the author during the 22 weeks of his Industrial Attachment with ExxonMobil. The basic nature of the work was in the area of Information Technology in the Plant Computing Department of ExxonMobil’s Singapore Refinery. The report first introduces the basic information about ExxonMobil as a company and its operations in Singapore. The chapters that follow describe in detail the work produced by the author. The first project (section 2.1) describes the development of the Mogas DBSCN Accounting System – a standalone application developed by the user to track components blended in the Motor Gasoline (Mogas) pool in the refinery. The second project (section 2.2) exhibits the application developed by the author to serve as a business continuity model for the ExxonMobil Berth Allocation System. This application ensures the continuity and speediness of shipping transactions at ExxonMobil’s berths in case of the failure of the main application. The third project (section 2.3) enumerates the various support and troubleshooting tasks undertaken by the author. These talks not only enhanced the IT expertise of the author, but also ensured the continued reliability of network infrastructure in the refinery. Apart from the major projects, the author took the initiative to be a part of various Project Management related tasks – e.g. Risk Assessments – in his sections. The author also contributed to ExxonMobil’s safety culture by delivering February 2009’s Safety Talk to the Plant Computing Group and to conduct numerous safety observations and walkabouts in the refinery. In order to ensure brevity and contextual accuracy, the sections requiring greater detailed have been cataloged as appendices at the end of the report.
author2 Zhang Cishen
author_facet Zhang Cishen
Adi Dahiya
format Industrial Attachment (IA)
author Adi Dahiya
author_sort Adi Dahiya
title Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
title_short Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
title_full Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
title_fullStr Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
title_full_unstemmed Industrial attachment report with ExxonMobile Asia Pacific Pte Ltd
title_sort industrial attachment report with exxonmobile asia pacific pte ltd
publishDate 2010
url http://hdl.handle.net/10356/42303
_version_ 1772825888055885824