Behaviour of DCM columns under highway embankment at bridge approaches

The large post-construction differential settlement between a bridge and the backfill behind the abutment has been the major problem in the construction of expressway embankment over a soft clay foundation. There are many methods to treat the soft clay and to control the total and differential se...

Full description

Saved in:
Bibliographic Details
Main Author: Lin, Kai Qiu.
Other Authors: Wong Kai Sin
Format: Theses and Dissertations
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10356/42746
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-42746
record_format dspace
spelling sg-ntu-dr.10356-427462023-03-03T19:20:10Z Behaviour of DCM columns under highway embankment at bridge approaches Lin, Kai Qiu. Wong Kai Sin School of Civil and Structural Engineering DRNTU::Engineering::Civil engineering::Structures and design The large post-construction differential settlement between a bridge and the backfill behind the abutment has been the major problem in the construction of expressway embankment over a soft clay foundation. There are many methods to treat the soft clay and to control the total and differential settlements. These methods include preloading with or without drainage and surcharge, replacement method and embankment piles, etc. In some cases, the use of soil-cement columns formed by deep cement mixing (DCM) can be an economical and effective alternative to improve the soft soils to minimise the settlement and to improve the stability of the bridge abutment. Doctor of Philosophy 2011-01-10T04:59:18Z 2011-01-10T04:59:18Z 2000 2000 Thesis http://hdl.handle.net/10356/42746 en 366 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Structures and design
spellingShingle DRNTU::Engineering::Civil engineering::Structures and design
Lin, Kai Qiu.
Behaviour of DCM columns under highway embankment at bridge approaches
description The large post-construction differential settlement between a bridge and the backfill behind the abutment has been the major problem in the construction of expressway embankment over a soft clay foundation. There are many methods to treat the soft clay and to control the total and differential settlements. These methods include preloading with or without drainage and surcharge, replacement method and embankment piles, etc. In some cases, the use of soil-cement columns formed by deep cement mixing (DCM) can be an economical and effective alternative to improve the soft soils to minimise the settlement and to improve the stability of the bridge abutment.
author2 Wong Kai Sin
author_facet Wong Kai Sin
Lin, Kai Qiu.
format Theses and Dissertations
author Lin, Kai Qiu.
author_sort Lin, Kai Qiu.
title Behaviour of DCM columns under highway embankment at bridge approaches
title_short Behaviour of DCM columns under highway embankment at bridge approaches
title_full Behaviour of DCM columns under highway embankment at bridge approaches
title_fullStr Behaviour of DCM columns under highway embankment at bridge approaches
title_full_unstemmed Behaviour of DCM columns under highway embankment at bridge approaches
title_sort behaviour of dcm columns under highway embankment at bridge approaches
publishDate 2011
url http://hdl.handle.net/10356/42746
_version_ 1759855361471283200