Hybrid evolutionary algorithm for multi-mode resource-constrained project scheduling problem
Scheduling problem is ubiquitous in many industries. However, real industrial scheduling problem can sometimes become too complicated. Therefore, specific problems are formulated as instances that can be studied in detail; one of which is known as the Multi-mode Resource-Constrained Project Scheduli...
Saved in:
Main Author: | Marshal, Brian. |
---|---|
Other Authors: | Low Yoke Hean, Malcolm |
Format: | Final Year Project |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/44142 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
by: Liu, Changchun, et al.
Published: (2019) -
Novel approach to solving stochastic constrained shortest path problem with quantum computing
by: Yang, Richard Chen Xiao
Published: (2023) -
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
Comparison of yard crane scheduling algorithms
by: Low, Yihang.
Published: (2012)