Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem

Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an...

Full description

Saved in:
Bibliographic Details
Main Author: Chandrasekaran, Hari Haran.
Other Authors: Low Yoke Hean, Malcolm
Format: Final Year Project
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10356/44839
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-44839
record_format dspace
spelling sg-ntu-dr.10356-448392023-03-03T20:28:56Z Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem Chandrasekaran, Hari Haran. Low Yoke Hean, Malcolm School of Computer Engineering DRNTU::Engineering::Computer science and engineering Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an activity cannot start before its immediate predecessor activities have finished. Second, performing each activity requires renewable/non-renewable resources which are limited capacity. This problem is extended to multi-mode resource constrained project scheduling problems (MMRCPSP), which is more related to real world problems, where each activity is executed in one of several modes. Each mode represents the combination of different resources and duration. MRCPSP is an NP-Hard problem and has received increasing attention for the past few years.In this research project, we focus on studying hybrid metaheuristic methods of Particle Swarm Optimization (PSO) for solving Multi-Mode Resource- Constrained Project Scheduling Problems (MMRCPSP). The purpose of this project is to explore and build a hybrid PSO framework that aims to solve MRCPSP efficiently in both quality of schedules and computational time. The obtained results will be applied to project scheduling related industry such as Maritime Rig Building, Construction Work, aircraft maintenance, repair and overhaul project scheduling in aerospace industry. Bachelor of Engineering (Computer Science) 2011-06-06T04:12:57Z 2011-06-06T04:12:57Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/44839 en Nanyang Technological University 99 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Computer science and engineering
spellingShingle DRNTU::Engineering::Computer science and engineering
Chandrasekaran, Hari Haran.
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
description Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an activity cannot start before its immediate predecessor activities have finished. Second, performing each activity requires renewable/non-renewable resources which are limited capacity. This problem is extended to multi-mode resource constrained project scheduling problems (MMRCPSP), which is more related to real world problems, where each activity is executed in one of several modes. Each mode represents the combination of different resources and duration. MRCPSP is an NP-Hard problem and has received increasing attention for the past few years.In this research project, we focus on studying hybrid metaheuristic methods of Particle Swarm Optimization (PSO) for solving Multi-Mode Resource- Constrained Project Scheduling Problems (MMRCPSP). The purpose of this project is to explore and build a hybrid PSO framework that aims to solve MRCPSP efficiently in both quality of schedules and computational time. The obtained results will be applied to project scheduling related industry such as Maritime Rig Building, Construction Work, aircraft maintenance, repair and overhaul project scheduling in aerospace industry.
author2 Low Yoke Hean, Malcolm
author_facet Low Yoke Hean, Malcolm
Chandrasekaran, Hari Haran.
format Final Year Project
author Chandrasekaran, Hari Haran.
author_sort Chandrasekaran, Hari Haran.
title Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
title_short Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
title_full Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
title_fullStr Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
title_full_unstemmed Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
title_sort using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
publishDate 2011
url http://hdl.handle.net/10356/44839
_version_ 1759858089255763968