Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem
Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/44839 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-44839 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-448392023-03-03T20:28:56Z Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem Chandrasekaran, Hari Haran. Low Yoke Hean, Malcolm School of Computer Engineering DRNTU::Engineering::Computer science and engineering Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an activity cannot start before its immediate predecessor activities have finished. Second, performing each activity requires renewable/non-renewable resources which are limited capacity. This problem is extended to multi-mode resource constrained project scheduling problems (MMRCPSP), which is more related to real world problems, where each activity is executed in one of several modes. Each mode represents the combination of different resources and duration. MRCPSP is an NP-Hard problem and has received increasing attention for the past few years.In this research project, we focus on studying hybrid metaheuristic methods of Particle Swarm Optimization (PSO) for solving Multi-Mode Resource- Constrained Project Scheduling Problems (MMRCPSP). The purpose of this project is to explore and build a hybrid PSO framework that aims to solve MRCPSP efficiently in both quality of schedules and computational time. The obtained results will be applied to project scheduling related industry such as Maritime Rig Building, Construction Work, aircraft maintenance, repair and overhaul project scheduling in aerospace industry. Bachelor of Engineering (Computer Science) 2011-06-06T04:12:57Z 2011-06-06T04:12:57Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/44839 en Nanyang Technological University 99 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Computer science and engineering |
spellingShingle |
DRNTU::Engineering::Computer science and engineering Chandrasekaran, Hari Haran. Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
description |
Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization problems in operations research. It can be described as follows: a single project consisting of N activities. Each activity has two kinds of constraints. First, precedence constraints require that an activity cannot start before its immediate predecessor activities have finished. Second, performing each activity requires renewable/non-renewable resources which are limited capacity. This problem is extended to multi-mode resource constrained project scheduling problems (MMRCPSP), which is more related to real world problems, where each activity is executed in one of several modes. Each mode represents the combination of different resources and duration. MRCPSP is an NP-Hard problem and has received increasing attention for the past few years.In this research project, we focus on studying hybrid metaheuristic methods
of Particle Swarm Optimization (PSO) for solving Multi-Mode Resource-
Constrained Project Scheduling Problems (MMRCPSP). The purpose of this
project is to explore and build a hybrid PSO framework that aims to solve
MRCPSP efficiently in both quality of schedules and computational time. The
obtained results will be applied to project scheduling related industry such as
Maritime Rig Building, Construction Work, aircraft maintenance, repair and
overhaul project scheduling in aerospace industry. |
author2 |
Low Yoke Hean, Malcolm |
author_facet |
Low Yoke Hean, Malcolm Chandrasekaran, Hari Haran. |
format |
Final Year Project |
author |
Chandrasekaran, Hari Haran. |
author_sort |
Chandrasekaran, Hari Haran. |
title |
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
title_short |
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
title_full |
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
title_fullStr |
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
title_full_unstemmed |
Using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
title_sort |
using particle swarm optimization techniques for solving multi-mode resource-constrained project scheduling problem |
publishDate |
2011 |
url |
http://hdl.handle.net/10356/44839 |
_version_ |
1759858089255763968 |