Effect of braced excavation on tunnels in clay

Braced excavation construction adjacent to a tunnel may cause damages to the tunnel during the excavation process. Damages to the tunnel could be caused by basal heave failure due to excavation, excessive tunnel movement and excessive bending moment induced during excavation. The purpose of this...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Wong, Teck Hong.
مؤلفون آخرون: Goh Teck Chee, Anthony
التنسيق: Final Year Project
اللغة:English
منشور في: 2011
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10356/44891
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
المؤسسة: Nanyang Technological University
اللغة: English
الوصف
الملخص:Braced excavation construction adjacent to a tunnel may cause damages to the tunnel during the excavation process. Damages to the tunnel could be caused by basal heave failure due to excavation, excessive tunnel movement and excessive bending moment induced during excavation. The purpose of this report is to investigate the impact of nearby braced excavation construction on various tunnel design configurations in soft clay. The aspects that are examined are displacement and bending moment of tunnel. Various design configurations such as depth of tunnel, wall embedment depth, wall stiffness, distance of tunnel from excavation are varied to study their effect on the displacements and bending moments of the tunnel. The results show that a stiffer wall can reduce both displacements and bending moments of the tunnel. However, its extent of improvement can be affected and restricted by the embedment depth of wall. The results show that an increase in embedment depth of wall yields significant improvement to performance of tunnel only if the wall is sufficiently stiff.