Traffic simulation platform
In the world of business, time and remuneration is always related to each and another. Each process may take certain time to complete, where it is directly impact a businessman or a company’s profit and their commitment to their valued customer. Manual arrangement may be good for less complicated jo...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/45705 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-45705 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-457052023-07-07T16:29:03Z Traffic simulation platform Lim, Chang Fei. Lim Meng Hiot School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering In the world of business, time and remuneration is always related to each and another. Each process may take certain time to complete, where it is directly impact a businessman or a company’s profit and their commitment to their valued customer. Manual arrangement may be good for less complicated job and process, but would be disaster if there are multiple job and process (eg. 6 Job with 10 Process). Hence, the essence of this project is to give an optimum solution for a company to have a optimum timespan (cycle time) to achieve an optimum output. This would be essential to fulfill customer requirement as well as company reputation/profit. For layman term, is to achieve a win-win situation. Bachelor of Engineering 2011-06-16T04:49:10Z 2011-06-16T04:49:10Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/45705 en Nanyang Technological University 52 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Electrical and electronic engineering |
spellingShingle |
DRNTU::Engineering::Electrical and electronic engineering Lim, Chang Fei. Traffic simulation platform |
description |
In the world of business, time and remuneration is always related to each and another. Each process may take certain time to complete, where it is directly impact a businessman or a company’s profit and their commitment to their valued customer. Manual arrangement may be good for less complicated job and process, but would be disaster if there are multiple job and process (eg. 6 Job with 10 Process).
Hence, the essence of this project is to give an optimum solution for a company to have a optimum timespan (cycle time) to achieve an optimum output. This would be essential to fulfill customer requirement as well as company reputation/profit. For layman term, is to achieve a win-win situation. |
author2 |
Lim Meng Hiot |
author_facet |
Lim Meng Hiot Lim, Chang Fei. |
format |
Final Year Project |
author |
Lim, Chang Fei. |
author_sort |
Lim, Chang Fei. |
title |
Traffic simulation platform |
title_short |
Traffic simulation platform |
title_full |
Traffic simulation platform |
title_fullStr |
Traffic simulation platform |
title_full_unstemmed |
Traffic simulation platform |
title_sort |
traffic simulation platform |
publishDate |
2011 |
url |
http://hdl.handle.net/10356/45705 |
_version_ |
1772826459886321664 |