Report on industrial attachment with Land Transport Authority
The author was involved in several projects namely the North East Line (NEL) Platform Gap Filler, Seng Kang/Punggol Light Rail Transit (SPLRT) Grab Poles, Proposed design for the C651 Trains Platform Gap Filler, Noise Study and C151 Train Temperature Measurement. Finite Element Analysis (FEA) was pe...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/46520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-46520 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-465202023-03-04T18:23:01Z Report on industrial attachment with Land Transport Authority Cheong, Candy. Lim Choon Seng School of Mechanical and Aerospace Engineering Land Transport Authority DRNTU::Engineering::Mechanical engineering The author was involved in several projects namely the North East Line (NEL) Platform Gap Filler, Seng Kang/Punggol Light Rail Transit (SPLRT) Grab Poles, Proposed design for the C651 Trains Platform Gap Filler, Noise Study and C151 Train Temperature Measurement. Finite Element Analysis (FEA) was performed on the NEL Platform Gap Filler and SPLRT Grab Poles. Five loading cases were considered in the analysis of NEL Platform Gap Filler. The maximum stresses of the five cases are within the allowable stress of the Aluminium L-bracket of 169.57 MPa. However, further testing would be desired to achieve a more accurate result. For the FEA of the SPLRT Grab Poles, the maximum stresses on the T-shaped and L-shaped grab poles are 104.2 MPa and 85.217 MPa respectively. Given an allowable stress of 217.39 MPa, both of the grab poles are able to withstand the maximum loading. In addition, the author designed a Platform Gap Filler for the C651 trains. The noise levels of the four locations (Ang Mo Kio, Bishan, Clementi and Jurong East) were measured and further investigation of the data collected would be made. Furthermore, temperature measurements of the C151 trains were recorded and they are approximately within the desired train temperature condition except for the journey from Bishan to City Hall Stations. In conclusion, the 22 weeks of Industrial Attachment has allowed the author to better appreciate the job scope of an engineer in the Rolling Stock Division of Land Transport Authority (LTA). 2011-12-13T06:23:57Z 2011-12-13T06:23:57Z 2011 2011 Industrial Attachment (IA) http://hdl.handle.net/10356/46520 en Nanyang Technological University 158 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Mechanical engineering |
spellingShingle |
DRNTU::Engineering::Mechanical engineering Cheong, Candy. Report on industrial attachment with Land Transport Authority |
description |
The author was involved in several projects namely the North East Line (NEL) Platform Gap Filler, Seng Kang/Punggol Light Rail Transit (SPLRT) Grab Poles, Proposed design for the C651 Trains Platform Gap Filler, Noise Study and C151 Train Temperature Measurement. Finite Element Analysis (FEA) was performed on the NEL Platform Gap Filler and SPLRT Grab Poles. Five loading cases were considered in the analysis of NEL Platform Gap Filler. The maximum stresses of the five cases are within the allowable stress of the Aluminium L-bracket of 169.57 MPa. However, further testing would be desired to achieve a more accurate result. For the FEA of the SPLRT Grab Poles, the maximum stresses on the T-shaped and L-shaped grab poles are 104.2 MPa and 85.217 MPa respectively. Given an allowable stress of 217.39 MPa, both of the grab poles are able to withstand the maximum loading. In addition, the author designed a Platform Gap Filler for the C651 trains. The noise levels of the four locations (Ang Mo Kio, Bishan, Clementi and Jurong East) were measured and further investigation of the data collected would be made. Furthermore, temperature measurements of the C151 trains were recorded and they are approximately within the desired train temperature condition except for the journey from Bishan to City Hall Stations. In conclusion, the 22 weeks of Industrial Attachment has allowed the author to better appreciate the job scope of an engineer in the Rolling Stock Division of Land Transport Authority (LTA). |
author2 |
Lim Choon Seng |
author_facet |
Lim Choon Seng Cheong, Candy. |
format |
Industrial Attachment (IA) |
author |
Cheong, Candy. |
author_sort |
Cheong, Candy. |
title |
Report on industrial attachment with Land Transport Authority |
title_short |
Report on industrial attachment with Land Transport Authority |
title_full |
Report on industrial attachment with Land Transport Authority |
title_fullStr |
Report on industrial attachment with Land Transport Authority |
title_full_unstemmed |
Report on industrial attachment with Land Transport Authority |
title_sort |
report on industrial attachment with land transport authority |
publishDate |
2011 |
url |
http://hdl.handle.net/10356/46520 |
_version_ |
1759856652609126400 |