Developing an integrated modular project control system for local construction projects using the artemis system
86 p.
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Research Report |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/46568 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-46568 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-465682023-03-03T16:47:00Z Developing an integrated modular project control system for local construction projects using the artemis system Tiong, Robert Lee Kong. Yap, Sook Foong. School of Civil and Structural Engineering DRNTU::Engineering::Civil engineering::Structures and design 86 p. Historically only the larger contractors use computers for their various management functions. However, with the availability of smaller and cheaper micro-computers, computer aided applications have become more popular. RP 7/88 2011-12-21T02:57:21Z 2011-12-21T02:57:21Z 1992 1992 Research Report http://hdl.handle.net/10356/46568 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Civil engineering::Structures and design |
spellingShingle |
DRNTU::Engineering::Civil engineering::Structures and design Tiong, Robert Lee Kong. Yap, Sook Foong. Developing an integrated modular project control system for local construction projects using the artemis system |
description |
86 p. |
author2 |
School of Civil and Structural Engineering |
author_facet |
School of Civil and Structural Engineering Tiong, Robert Lee Kong. Yap, Sook Foong. |
format |
Research Report |
author |
Tiong, Robert Lee Kong. Yap, Sook Foong. |
author_sort |
Tiong, Robert Lee Kong. |
title |
Developing an integrated modular project control system for local construction projects using the artemis system |
title_short |
Developing an integrated modular project control system for local construction projects using the artemis system |
title_full |
Developing an integrated modular project control system for local construction projects using the artemis system |
title_fullStr |
Developing an integrated modular project control system for local construction projects using the artemis system |
title_full_unstemmed |
Developing an integrated modular project control system for local construction projects using the artemis system |
title_sort |
developing an integrated modular project control system for local construction projects using the artemis system |
publishDate |
2011 |
url |
http://hdl.handle.net/10356/46568 |
_version_ |
1759857950837440512 |