A case study on Wah Kee Engineering Pte Ltd.
This report is based on a case study on a local SME, Wah Kee Engineering Pte. Ltd. (WKE). WKE is a business-to-business company dealing with companies in the oil-and-gas industry. Like most SMEs, it faces many challenges in its daily operations. With unproductive methods of operations and lim...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/48267 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-48267 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-482672023-05-19T06:24:07Z A case study on Wah Kee Engineering Pte Ltd. Choy, Chan Yuan. Koh, Jun Hao. Cheng Ooi Lan Nanyang Business School Wah Kee Engineering Pte Ltd DRNTU::Business::Management::Productivity This report is based on a case study on a local SME, Wah Kee Engineering Pte. Ltd. (WKE). WKE is a business-to-business company dealing with companies in the oil-and-gas industry. Like most SMEs, it faces many challenges in its daily operations. With unproductive methods of operations and limited ability to tap economies of scale, WKE has commissioned us to seek ways to optimize its internal processes to reduce costs and improve its competitive advantage. Having obtained a mandate from the management of WKE to act as consultants to perform a thorough study on the company’s current work processes, we started by reviewing the possible frameworks that can be applied. After some deliberation, we decided to apply the value chain framework, which helped identify various inefficiencies in WKE’s different operating activities. At the end of the study, we identified Inbound Logistics, Firm Infrastructure and Procurement activities as the main areas with processes that could be improved. As such, we have decided to focus on these 3 activities in our study. Thus, the results of our consultancy work are the following deliverables: 1. Inventory Monitoring System and Procedures: Deliverable 1: Appendix G: G-1 to G-11 2. Cost and Managerial Accounting System: Deliverable 2: Appendix H: H-1 to H-4 Working closely with WKE’s management team, we developed our deliverables based on the requirements and needs of the company. BUSINESS 2012-04-03T03:59:22Z 2012-04-03T03:59:22Z 2012 Final Year Project (FYP) http://hdl.handle.net/10356/48267 en Nanyang Technological University 70 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Business::Management::Productivity |
spellingShingle |
DRNTU::Business::Management::Productivity Choy, Chan Yuan. Koh, Jun Hao. A case study on Wah Kee Engineering Pte Ltd. |
description |
This report is based on a case study on a local SME, Wah Kee Engineering Pte. Ltd. (WKE).
WKE is a business-to-business company dealing with companies in the oil-and-gas industry. Like most SMEs, it faces many challenges in its daily operations. With unproductive methods of operations and limited ability to tap economies of scale, WKE has commissioned us to seek ways to optimize its internal processes to reduce costs and improve its competitive advantage.
Having obtained a mandate from the management of WKE to act as consultants to perform a thorough study on the company’s current work processes, we started by reviewing the possible frameworks that can be applied. After some deliberation, we decided to apply the value chain framework, which helped identify various inefficiencies in WKE’s different operating activities. At the end of the study, we identified Inbound Logistics, Firm Infrastructure and Procurement activities as the main areas with processes that could be improved.
As such, we have decided to focus on these 3 activities in our study. Thus, the results of our consultancy work are the following deliverables:
1. Inventory Monitoring System and Procedures: Deliverable 1: Appendix G: G-1 to G-11
2. Cost and Managerial Accounting System: Deliverable 2: Appendix H: H-1 to H-4
Working closely with WKE’s management team, we developed our deliverables based on the requirements and needs of the company. |
author2 |
Cheng Ooi Lan |
author_facet |
Cheng Ooi Lan Choy, Chan Yuan. Koh, Jun Hao. |
format |
Final Year Project |
author |
Choy, Chan Yuan. Koh, Jun Hao. |
author_sort |
Choy, Chan Yuan. |
title |
A case study on Wah Kee Engineering Pte Ltd. |
title_short |
A case study on Wah Kee Engineering Pte Ltd. |
title_full |
A case study on Wah Kee Engineering Pte Ltd. |
title_fullStr |
A case study on Wah Kee Engineering Pte Ltd. |
title_full_unstemmed |
A case study on Wah Kee Engineering Pte Ltd. |
title_sort |
case study on wah kee engineering pte ltd. |
publishDate |
2012 |
url |
http://hdl.handle.net/10356/48267 |
_version_ |
1770563474451070976 |